https://www.miningweekly.com
Freeport McMoRan|United States|Bagdad Mine|Copper|Equipment|Job Creation|Mining|Molybdenum|Kathleen Quirk|Arizona
|||Equipment|||
freeport-mcmoran-company|united-states|bagdad-mine|copper|equipment|job-creation|mining|molybdenum|kathleen-quirk|arizona

Freeport approves $4.5bn expansion, modernisation of Arizona copper project

An autonomous truck in operation at the Bagdad mine

An autonomous truck in operation at the Bagdad mine

Photo by Freeport McMoRan

5th November 2026

By: Chanel de Bruyn

Creamer Media Online Managing Editor

     

Font size: - +

Metals company Freeport McMoRan's board has approved a $4.5-billion expansion and modernisation programme for its Bagdad copper and molybdenum operation, in northwest Arizona, in the US.

"We are pleased to proceed with the Bagdad expansion, an important step in advancing Freeport’s US copper growth strategy. This low-risk brownfield project builds on Bagdad’s substantial reserve base, long operating history, existing infrastructure and experienced workforce to deliver new US copper and molybdenum production and further strengthen Freeport’s position as 'America’s copper champion',” comments Freeport president and CEO Kathleen Quirk.

The metals miner points out that the expansion project is expected to more than double the Bagdad operation's mining and milling rates and position the mine as the second-largest copper mine in the US.

Copper output from Bagdad is slated to increase by about 225-million pounds a year to more than 400-million pounds a year, while molybdenum production is expected to increase by about 12-million pounds a year to more than 20-million pounds a year.

The Bagdad mine has been in operation since 1945 and, in 2025, became the first major US mine to operate a fully autonomous haulage fleet.

The expansion and modernisation programme will include investment in an expanded processing capacity; new concentrator facilities to provide about 115 000 t a day of incremental processing capacity; and supporting infrastructure, including a new primary crusher, overland conveyor, water pipeline, power line, mining equipment and related facilities.

Construction of the new infrastructure will take about three and a half years to complete, with initial production targeted for mid-2030. The project is expected to create more than 4 000 direct and indirect jobs during construction.

The expanded operation is also expected to create thousands of long-term employment opportunities, while also reducing long-term unit net cash costs by about 20%.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Environmental Impact Management Services
Environmental Impact Management Services

EIMS is an independent specialised environmental consulting firm offering the full spectrum of environmental management services across all sectors...

VISIT SHOWROOM 
Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

➕

➕

➕

➕

➕

RESEARCH CHANNEL AFRICA

SUBSCRIBE

➕

➕

➕

➕

➕

➕

➕

➕

➕

➕

CORPORATE PACKAGES

CLICK FOR A QUOTATION

➕

➕







sq:0.026 0.047s - 116pq - 2rq
Subscribe Now