https://www.miningweekly.com
Treo|Building|Gold Mining|Mining|Project Scheduling|Agile|Critical Path Method
Treo|Building||
Treo|building|gold-mining|mining|project-scheduling|agile|critical-path-method

Beyond Gantt: Choosing the Right Scheduling Approach for Mine Projects

2nd November 2026

     

Font size: - +

(Virtual Showroom) When most people think of project scheduling, the image that comes to mind is a familiar one: the Gantt chart. It’s a great tool, especially for visualizing dependencies and deadlines, but in the fast-paced, operationally constrained world of mining projects, it’s rarely enough on its own.

At Treo Group, we’ve learned that successful project scheduling in a live mine environment isn’t about which software you use - it’s about choosing the right approach to match the project’s complexity, risk profile, and operational realities.

When the Mine Never Sleeps

In a greenfield project, you can pause, plan, and execute in controlled phases. But on an operating mine, your project needs to fit around a living, breathing production ecosystem - one that doesn’t stop for maintenance or new installations. This means project managers must blend flexibility with precision, ensuring innovation projects can unfold safely without disrupting daily output.

Take, for example, a recent sampling and measurement improvement program Treo Group managed at a multi-site gold operation. The objective was to enhance the accuracy, efficiency, and reliability of sampling and measurement systems through infrastructure upgrades, procedural alignment, and data-driven dashboards.

The challenge? Rolling out changes across multiple active plants - each with different constraints, schedules, and production priorities - while ensuring the sampling process continued uninterrupted.

Beyond the Gantt

A traditional Gantt chart couldn’t capture the interdependencies between site operations, shift cycles, and stakeholder readiness. Instead, our project managers adopted a hybrid approach: combining elements of Critical Path Method (CPM) for strategic sequencing with Agile-style sprints to manage field implementation and stakeholder engagement.

The CPM schedule provided the “big picture” - identifying which activities determined project success. The sprint-based execution allowed teams to deliver incremental improvements, collect feedback, and adjust quickly to site realities.

This balance between structure and agility helped ensure that each milestone built measurable value without bottlenecking production.

The Power of Process

Choosing the right scheduling approach also meant building trust and ownership among cross-functional teams. Each site had unique needs, and the project’s success depended on aligning priorities - from plant operators and metallurgists to automation specialists and corporate leadership.

By establishing clear communication rhythms and visual progress dashboards, Treo Group made complex interdependencies visible and manageable. The result was a project that delivered on scope while strengthening operational discipline, data visibility, and team collaboration across the board.

A Strategic Advantage for Decision-Makers

For senior decision-makers, the message is clear: the right scheduling approach isn’t just about delivering on time - it’s about delivering value intelligently. In live mining environments, where production pressures are constant, an adaptive scheduling strategy can mean the difference between disruption and seamless integration.

At Treo Group, we help mining operations translate innovation into real, measurable performance - without compromising production.

Visit our website to book an exploration call and discover how smarter scheduling can unlock more value from your next project.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

ECG Engineering
ECG Engineering

ECG provides specialised electrical engineering services to the Mining, Utilities, Materials Handling and Industrial industries, with extensive and...

VISIT SHOWROOM 
Virtual Gas Network (Pty) Ltd
Virtual Gas Network (Pty) Ltd

Virtual Gas Network supplies compressed natural gas via a virtual gas distribution network.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (30/10/2026)
30th October 2026 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

➕

➕

➕

➕

➕

RESEARCH CHANNEL AFRICA

SUBSCRIBE

➕

➕

➕

➕

➕

➕

➕

➕

➕

➕

CORPORATE PACKAGES

CLICK FOR A QUOTATION

➕

➕







sq:0.021 0.046s - 114pq - 2rq
Subscribe Now