https://www.miningweekly.com
Venice|Alkeemia|International Graphite|Europe|Italy|Porto Marghera|Advanced Manufacturing|Building|Critical Minerals|Defence|Energy Storage|Graphite
|||||Building|
venice|alkeemia|international-graphite|europe|italy|porto-marghera|advanced-manufacturing|building|critical-minerals|defence|energy-storage|graphite

Porto Marghera graphite processing hub, Italy

Image of lump of graphite

25th September 2026

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Porto Marghera graphite processing hub.

Location
Alkeemia’s industrial chemical precinct at Porto Marghera, near Venice, Italy.

Project Owner/Sponsor
The project will be developed through a joint venture (JV) between International Graphite (49%) and Alkeemia (51%), with profits to be shared equally.

Project Description
International Graphite signed a binding joint venture and shareholders’ agreement with Alkeemia in May 2026 to establish the Porto Marghera graphite processing hub.

The project envisages the construction of a graphite processing facility to supply processed graphite products to Europe’s industrial, energy storage, advanced manufacturing and defence sectors.

The first phase targets the production of about 10 000 t/y of graphite products, with the technical and financial evaluation based on production of 10 500 t/y.

The selected equipment can produce up to 10 800 t/y. The plant design includes a fully enclosed production building, two micronising lines and a jet mill to produce finer graphite products.

A second phase is planned to increase capacity to about 15 000 t/y within three years. Graphite concentrate feedstock will be imported to Porto Marghera in one-tonne bulk bags transported in 20 ft containers.

The project’s feedstock requirement is estimated at about 10 800 t/y of graphite concentrate.

Potential Job Creation
Not disclosed.

Net Present Value/Internal Rate of Return
Not disclosed.

Capital Expenditure
International Graphite’s capital contribution is estimated at A$12-million for the initial 10 000 t/y facility. This includes A$8.8-million for direct plant and equipment, including freight, installation, growth allowance and contingency; A$3-million for construction management, owners’ costs and first fills; and A$200 000 for other costs.

Alkeemia will contribute access to land, permitting arrangements, warehousing, laboratories, control rooms, waste management systems, logistics and the operational workforce.

Planned Start/End Date
A final investment decision is targeted for the third quarter of 2026.

Construction is planned to start in the third quarter of 2026, subject to final investment decision and funding.

First production is targeted for the second half of 2027. Permitting is expected in the second half of 2026.

Latest Developments
Project financing discussions are ongoing, with International Graphite investigating project-level financing, cornerstone investors and EU critical minerals funding programmes.

Key Contracts, Suppliers and Consultants
None disclosed.

Contact Details
Alkeemia, tel +39 041 50 96 998 or email info@alkeemia.com.
International Graphite, tel +61 8 9380 9277.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

ASTPM
ASTPM

Established in 1983, the ASTPM is an industry association and representative body of the welded carbon steel tube and pipe manufacturers of South...

VISIT SHOWROOM 
Mine Safe Global
Mine Safe Global

A Leader in Mining Collision Avoidance Systems

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

➕

➕

➕

➕

➕

RESEARCH CHANNEL AFRICA

SUBSCRIBE

➕

➕

➕

➕

➕

➕

➕

➕

➕

➕

CORPORATE PACKAGES

CLICK FOR A QUOTATION

➕

➕







sq:0.044 0.079s - 117pq - 2rq
Subscribe Now