Oyu Tolgoi Shaft 2 construction complete
The construction of Shaft 2 at the Oyu Tolgoi mine, in Mongolia, has been declared complete.
Shaft 2 – a 10-m-diameter shaft sunk to about 1.3 km below the surface – would accelerate the underground development of the Oyu Tolgoi mine, Rio Tinto-controlled Turquoise Hill said on Monday.
The miner noted that the shaft used the world's largest production hoist motor and could carry 300 people in the service hoist and lift 60 t skips in the production hoist. When operating at maximum capacity, the production hoist has the ability to lift 35 000 t of material to the surface daily.
“With the construction of Shaft 2 complete, and the service hoist operating permit being granted, the service hoist now allows us to transport 300 people per cage cycle versus a maximum of 60 people per cage cycle through Shaft 1. The 48-t capacity cage can now be used to support logistics, transporting supplies and components for development of the mine,” the TSX- and NYSE-listed company said.
Commissioning of the production hoist continued with more than 2 700 t of rock successfully hoisted to surface, and Turquoise Hill said that it continued to work with the regulatory agencies to finalise the permitting.
Shaft 2 was constructed using almost 5 000 t of steel and more than 300 km of electrical cabling.
Oyu Tolgoi is jointly owned by the government of Mongolia (34%) and Turquoise Hill (66%, of which Rio Tinto owns 51%).
Turquoise Hill's stock gained more than 3% on Monday, closing at C$0.58 apiece in Toronto and $0.45 a share in New York.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation