https://www.miningweekly.com
Albemarle|Arcadium Lithium|Citi|IGO|Tianqi Lithium|Australia|Kwinana Refinery|Electric Vehicles|Lithium|Western Australia
||||
albemarle|arcadium-lithium|citi|igo|tianqi-lithium|australia|kwinana-refinery|electric-vehicles|lithium|western-australia

IGO, Tianqi Lithium to cease ops at lithium hydroxide plant in Western Australia

The Kwinana refinery

The Kwinana refinery

24th January 2025

By: Reuters

  

Font size: - +

Shares of IGO rose on Friday, after the lithium producer reached an agreement with its Chinese joint-venture partner Tianqi Lithium to cease all works at one of its lithium hydroxide plants in Western Australia.

Shares of the Australian battery metal producer were up as much as 4.6% to A$5.450, as of 00:39 GMT.

IGO warned of an additional net loss in its first-half results earlier this week, citing a decline in value of its troubled Kwinana refinery, which includes lithium hydroxide plant 2 that was expected to produce 24 000 metric tons per year, but has been plagued by design issues and weak lithium pricing.

Citi analysts noted that the announcement was "not a surprise and removes an overhang".

The focus now shifts to other performing assets in Kwinana, they said, adding that investor sentiment towards Kwinana is already weak, and stopping downstream activities could simplify the capital return story.

Some mines that produce lithium, used in electric vehicle batteries, have curtailed operations or delayed expansions after a 90% drop in prices over the last two years, while other loss-making mines have maintained production, largely because they have the support of Chinese battery-makers.

A growing list of producers have been reviewing lithium operations in Australia since last year amid a rout in prices that is expected to result in more production cuts, which included the likes of Arcadium Lithium and Albemarle.

Tianqi Lithium, in a separate announcement on Thursday, determined in a board meeting that "continuing with the construction of Lithium Hydroxide Project Train II is not economically viable".

On Friday, it stated it sees a total impairment provision of around 1.412-billion yuan ($193.74-million) "for construction in progress and right-of-use assets" at the plant.

Edited by Reuters

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Trotech
Trotech

Design, Construction and Maintenance of Site Erected, Welded Bulk Storage Tanks for the Petrochemical, LNG, Ammonia and Sustainable fuel Sectors.

VISIT SHOWROOM 
AQS Liquid Transfer
AQS Liquid Transfer

AxFlow AQS Liquid Transfer (Pty) Ltd is an Importer and Distributor of Pumps in Southern Africa

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (30/10/2026)
30th October 2026 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

➕

➕

➕

➕

➕

RESEARCH CHANNEL AFRICA

SUBSCRIBE

➕

➕

➕

➕

➕

➕

➕

➕

➕

➕

CORPORATE PACKAGES

CLICK FOR A QUOTATION

➕

➕







sq:0.046 0.068s - 133pq - 2rq
Subscribe Now