https://www.miningweekly.com
Africa|Construction|Design|Energy|Engineering|Hydropower|Innovation|Power|PROJECT|Renewable Energy|Renewable-Energy|Resources|Solar|Storage|Testing|Maintenance|Infrastructure|Operations
Africa|Construction|Design|Energy|Engineering|Hydropower|Innovation|Power|PROJECT|Renewable Energy|Renewable-Energy|Resources|Solar|Storage|Testing|Maintenance|Infrastructure|Operations
africa|construction|design|energy|engineering|hydropower|innovation|power|project|renewable-energy|renewable-energy-company|resources|solar|storage|testing|maintenance|infrastructure|operations

UAE firm moves to partner with Ethiopia to unlock solar potential

9th April 2021

By: John Muchira

Creamer Media Correspondent

     

Font size: - +

United Arab Emirates-based renewable- energy company Masdar has committed to helping Ethiopia exploit its enormous solar energy potential to spur economic growth.

This comes after the company signed a memorandum of understanding with the Ethiopian government to explore solar opportunities across the country, with a target to generate 500 MW in the medium term.

“This initiative will mark a significant step forward for Ethiopia’s efforts to diversify its energy mix and to drive economic development,” says Masdar CEO Mohamed Jameel Al Ramahi.

He adds that Masdar has been a catalyst for renewable-energy and clean-tech innovation in more than 30 countries and is determined to cooperate with the Ethiopian government to help deliver universal access to electricity in the country.

In Africa, Masdar’s solar development efforts have seen the company complete 30 MW of solar photovoltaic (PV) in Egypt, while it is also working alongside EDF and Green Africa to develop a project in Morocco that will feature PV, concentrated solar power and energy storage.

The agreement covers the development, financing, design, engineering, procurement, construction, testing, commissioning, insurance, ownership, operation, maintenance and transfer of photovoltaic (PV) plants and the infrastructure required to transmit the electricity.

Additional plans call for the signing of power purchase agreements and other agreements later this year and to begin commercial operations in 2022.

Despite its abundant solar resources, Ethiopia has only 14 MW of solar generation capacity, equivalent to 0.3% of its total generation capacity.

The country has identified nine sites with potential to generate 900 MW. An amount of $1.2-billion will be required to implement the project under a public–private partnership arrangement.

Although Ethiopia has committed massive resources into the energy sector, particularly hydro and wind, about half of the country’s 100-million population does not have access to electricity.

The country’s National Electrification Programme aims to achieve universal energy access by 2025 and to become a power hub in the East African region, with exports to countries such as Kenya, Djibouti and South Sudan.

The Ethiopian government is also focused on diversifying its energy mix so that it includes wind, solar and geothermal sources to reduce dependence on hydropower.

Research has shown that virtually nonexistent solar PV capacity in Ethiopia can reach an impressive 3.3 GW by 2025 and hit the 5.3 GW mark by 2030.

Currently, hydro accounts for 96% of electricity generation in Ethiopia, with the remainder generated using wind.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Latest News

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024

Showroom

Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 
M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.114 0.148s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: