https://www.miningweekly.com
Copper|Gold|Waste|Waste
Copper|Gold|Waste|Waste
copper|gold|waste-company|waste

Barrick meets FY gold and copper guidance

16th January 2024

By: Creamer Media Reporter

     

Font size: - +

Canada-headquartered Barrick has achieved its 2023 production guidance, producing 4.05-million ounces of gold and 420-million pounds of copper last year.

The 2023 output, however, is a reduction on the 4.14-million ounces of gold and 440-million pounds of copper produced in 2022.

The company’s preliminary fourth-quarter results show sales of 1.04-million ounces of gold and 117-million pounds of copper, as well as preliminary production of 1.05-million ounces of gold and 113-million pounds of copper.

December quarter gold production was an improvement on the third quarter’s and was the highest quarter for the year, with stronger performances from Cortez and Phoenix, in Nevada, as well as from Pueblo Viejo, in Dominican Republic. This was offset by lower production at Loulo-Gounkoto, in Mali.

Fourth-quarter costs are forecast to be higher, with all-in sustaining costs (AISC) expected to be between 8% and 10% higher than the prior quarter.

Preliminary fourth-quarter copper production was in line with the third quarter, with consistent production across all three sites. Compared with the September quarter, fourth-quarter copper cost of sales per pound is expected to be 8% to 10% higher, C1 cash costs per pound are expected to be 5% to 7% higher and AISC per pound is expected to be 2% to 4% lower, principally on the back of lower capitalised waste stripping at Lumwana, in Zambia.

Barrick will release its quarterly and full-year results on February 14.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

Showroom

WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 
SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.147 0.216s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: