Australian explorer Critica confirms tungsten project potential in Tasmania
A newly published scoping study on ASX-listed Critica's Mt Lindsay tin/tungsten project in Tasmania finds the proposed one-million-tonne-a-year underground mining and processing development has an after-tax net present value of about A$1.01-billion, an internal rate of return of 56% and payback period of about 1.9 years - at base case prices.
The project has an estimated pre-production capital requirement of A$244-million, compared with life-of-mine (LoM) sales revenue potential of A$5.2-billion, over a 13.5-year lifetime.
The scoping study outlines an underground development pathway for Mt Lindsay with significant exposure to tin and tungsten, which are commodities with important applications across electronics, advanced manufacturing, defence and aerospace.
The study, as prepared by consultancy DRA Global, contemplates an owner-operated underground mining and processing operation incorporating dual-decline access, longhole open stoping with paste fill, conveyor materials handling, a tin/tungsten/magnetite processing flowsheet and supporting infrastructure.
Critica explains the underground concept represents a material departure from the historical openpit development approach and seeks to minimise additional surface disturbance through project design.
Notably, Mt Lindsday gives Critica substantial exposure to tungsten which can contribute about 75% of the modelled base case LoM revenue - at a time when secure Western supply of tungsten is becoming more strategically important.
The current scoping study economics exclude copper and other potential byproducts, which means there is further project upside subject to metallurgical and commercial evaluations.
"Our focus now is on systematically advancing the technical, metallurgical, approvals, funding and commercial work required to progress Mt Lindsay toward a definitive feasibility study," says Critica CEO Jacob Deysel.
He adds that the Jupiter rare earths project's scoping study is also due to be published shortly.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation


















