Alrosa posts H1 loss due to weak diamond market, strong rouble
MOSCOW - Russian diamond miner Alrosa, the world's largest diamond producer, slipped into a loss in the first half of 2026 amid an ongoing industry crisis and a strong rouble, the company said on Thursday.
Alrosa's net loss for the first half of the year amounted to 9.5-billion roubles ($110.08-million), compared with a profit of 40.6-billion roubles a year earlier.
Revenue, including subsidies, fell 33% year-on-year to 91.7-billion roubles due to weak market conditions, compounded by the strengthening rouble, relatively high interest rates and inflation in Russia.
Alrosa, with a global market share of about 30%, reduced production by 10% to 29.8-million carats in 2025.
The company expects output to decline to 25 to 26-million carats in 2026 and then recover to 29 to 30-million carats once the market stabilises.
By the end of the first half of 2026, the Russian company had accumulated diamond inventories worth 150.8-billion roubles.
Alrosa, which has been under Western sanctions since 2022, temporarily suspended operations at low-margin assets in 2025 and 2026.
Alrosa said it was seeing inventory normalisation in India's diamond-cutting sector following large-scale destocking in 2024 to 2025, as well as rising polished-diamond prices across all size categories and stable demand for diamonds larger than two carats.
Continued strong demand by value for high-end jewellery in key consumer markets, including the US, India and China, supports expectations of a recovery in the market balance over the medium term, the company said.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation


















