https://www.miningweekly.com

Ranger suspension pushes ERA into A$127m half-year loss

Ranger suspension pushes ERA into A$127m half-year loss

Photo by Bloomberg

1st August 2014

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – Embattled uranium miner Energy Resources of Australia (ERA) has reported a 138% decline in net profits for the half-year ended June, which was recorded at a loss of A$127.2-million.

This was compared with a net loss of A$54-million during the previous comparable period, as no uranium oxide was produced during the period under review, after operations at its Ranger mine, in the Northern Territory, were suspended in December last year.

A progressive restart of the Ranger processing plant started in early June, following the receipt of written approval from the Commonwealth and state governments. Plant operations at the Ranger mine were suspended after a mixture of slurry moved outside the containment area, following the failure of a leach tank.

ERA has previously reported that full processing capacity would be reached during the September quarter.

Meanwhile, revenue for the half-year under review was up 26% on the previous corresponding period, to A$171.6-million on the back of higher sales volumes. ERA noted that a decrease in the average realised sales price was partially offset by a weaker Australian:US dollar exchange rate.

Sales volume for the half-year were also up to 1 524 t, compared with the 1 147 t sold in the previous corresponding period, with sales in the first half of the year supplied by existing levels of finished goods inventory on hand.

For the second half of the financial year, sales volumes were expected to be in line with the half-year ended June.

Edited by Mariaan Webb
Creamer Media Contract Publishing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Rosond
Rosond

ROSOND provides fast, efficient, safe, and cost-effective drilling and grouting services to mining and exploration industries throughout Africa.

VISIT SHOWROOM 
Monitor Distributors
Monitor Distributors

We at Hawk High Pressure Pumps specialise in industrial pumps and pumping systems. Our high pressure washing equipment is locally manufactured and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (10/07/2026)
10th July 2026 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.044 0.066s - 110pq - 2rq
Subscribe Now