https://www.miningweekly.com
Hillgrove Resources|Pybar|Australia|Kanmantoo|Copper|Mining|South Australia
||||
hillgrove-resources|pybar|australia|kanmantoo|copper|mining|south-australia

Kanmantoo underground project – Stage 1, Australia – update

Image of Kanmantoo undergound

Photo by Hillgrove Resources

17th October 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Kanmantoo underground project – Stage 1.

Location
Adelaide Hills, South Australia.

Project Owner/s
Australian mining company Hillgrove Resources.

Project Description
Hillgrove is producing from the Kanmantoo underground mine which has a mineral resource of 19.3-million tonnes grading 0.77% copper and an ore reserve of 2.8-million tonnes grading 0.91% copper. Underground mining rates are targeted to be between 1.2-million tonnes a year and 1.4-million tonnes a year.

Kanmantoo has quickly ramped up to a copper production rate of about 12 000 t/y. The mine is well capitalised with a 3.6-million-tonne-a-year processing plant and has multiple opportunities to increase production rates, grow the resource base, and extend mine life.

The project includes the Kavanagh and Nugent mineral resources.

Potential Job Creation
About 130 jobs are expected.

Net Present Value/Internal Rate of Return
The project has an estimated net present value of A$165-million and an internal rate of return of 231%, with a payback of nine months.

Capital Expenditure
The economic assessment published in February 2023 estimated that the project could be brought online at a capital cost of A$25-million.

Planned Start/End Date
Commercial production was declared in July 2024.

Latest Developments
Hillgrove Resources has started production from the Nugent deposit.

Production blasting and stope extraction have started ahead of schedule, with the first stope ore expected to be processed before the end of October.

The transition from development to production at Nugent adds a new high-quality ore source to the Kanmantoo underground operation. Together with the nearby Kavanagh mineralisation, Nugent is expected to lift the mine’s annualised production rate from 1.7-million to 1.8-million tonnes a year in the first half of 2026.

Hillgrove has said the addition of Nugent will increase mining rates, improve margins by lowering unit operating costs, and enhance efficiency by easing underground congestion and providing greater operational flexibility. 

Key Contracts, Suppliers and Consultants
Pybar (exploration decline).

Contact Details for Project Information
Hillgrove Resources, tel +61 8 7070 1698.
 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

SafeQuip
SafeQuip

SafeQuip is a leading distributor and manufacturer of fire safety solutions, offering a comprehensive range of products designed to meet all...

VISIT SHOWROOM 
AirNox Pty Ltd
AirNox Pty Ltd

AirNox (Pty) Ltd is a level 1 BBBEE manufacturer of complete AdBlue® solutions for operators of SCR diesel engines and AUS40 across South Africa...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.047 0.078s - 116pq - 2rq
Subscribe Now