https://www.miningweekly.com
Springs|DRDGOLD|South Africa|Brakpan Tailings Storage Facility|Daggafontein Tailings Storage Facility|Ergo Plant|Gold Mining|Tailings|Gauteng
|||||
springs|drdgold|south-africa|brakpan-tailings-storage-facility|daggafontein-tailings-storage-facility|ergo-plant|gold-mining|tailings|gauteng

Daggafontein tailings storage facility, South Africa – update

Image of tailings treatment operation

Photo by DRDGOLD

8th May 2026

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Daggafontein tailings storage facility (TSF).

Location
East of Springs, in Gauteng, South Africa.

Project Owner/s
Gold producer DRDGOLD, a specialist in the recovery of the metal from the retreatment of surface tailings.

Project Description
DRDGOLD has moved the Daggafontein TSF out of the company’s reserves to resume the TSF as a deposition facility to supplement the Brakpan TSF, at least until it can commission its longer-term TSF initiative, Withok, immediately south of the Brakpan TSF.

The Daggafontein TSF is being connected to the Ergo plant through a pipeline and pumpstation infrastructure to support the resumption of deposition.

The Daggafontein TSF will have a deposition capacity of 120-million tonnes and a life of 20 years at a deposition rate of 500 000 t a month.

Potential Job Creation
Not disclosed.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
Resumption is expected to be completed in the first quarter of the 2027 financial year.

Latest Developments
DRDGOLD reported in February 2026 that construction of the necessary infrastructure at Ergo’s Brakpan plant, and of the project’s 21 km dual pipeline linking the plant to the Daggafontein TSF, was nearing completion. 

Its results for the six months ended December 31, 2025, notes that preparation of the TSF is continuing apace on schedule and within budget. First deposition is expected in first quarter of the financial year ending June 30, 2027.

Key Contracts, Suppliers and Consultants
Not disclosed.

Contact Details for Project Information
DRDGOLD, tel +27 11 470 2600.
Third Act Consulting, on behalf of DRDGOLD, email DRDGOLD_Communications@thirdactconsultants.com.
 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Willard
Willard

Rooted in the hearts of South Africans, combining technology and a quest for perfection to bring you a battery of peerless standing. Willard...

VISIT SHOWROOM 
SafeQuip
SafeQuip

SafeQuip is a leading distributor and manufacturer of fire safety solutions, offering a comprehensive range of products designed to meet all...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.051 1.055s - 117pq - 2rq
Subscribe Now