https://www.miningweekly.com
Dallas|CleanTech Lithium|DuPont|Empower EIT|Hephaistos Insights|Seprosys|Xian Lanshen New Material Company|Zelandez|Chile|Laguna Verde|Critical Minerals|Lithium|Direct Lithium Extraction
|||||
dallas|cleantech-lithium|dupont|empower-eit|hephaistos-insights|seprosys|xian-lanshen-new-material-company|zelandez|chile|laguna-verde|critical-minerals|lithium|direct-lithium-extraction

CleanTech, Empower produce first lithium carbonate from Laguna Verde brines and pilot eluate

Laguna Verde project area

Laguna Verde project area

24th July 2026

By: Marleny Arnoldi

Online News Editor

     

Font size: - +

Aim-listed CleanTech Lithium and technology partner Empower EIT have successfully produced high-purity lithium carbonate from eluate produced by CleanTech's direct lithium extraction (DLE) pilot plant in Chile.

About 330 kg of high-purity lithium carbonate has been produced with grades between 99.68% and 99.91%, with the downstream processing having been undertaken by US-based vertically integrated lithium producer Empower.

CleanTech says further key testwork is under way to optimise and verify the process used in the Laguna Verde prefeasibility study (PFS).

CleanTech has asked leading lithium brine services company Zelandez to conduct a comprehensive spent brine reinjection options analysis to support the sustainable development of Laguna Verde.

Meanwhile, in delivering CleanTech's first batch of high-purity lithium carbonate, Empower processed about 55 000 litres of eluate at its advanced lithium processing facility in Dallas. The eluate was produced from Laguna Verde brine at CleanTech's DLE pilot plant, in Chile.

CleanTech partnered with Empower for the downstream processing of eluate produced at the DLE plant to demonstrate a process that can consistently produce lithium carbonate product from CleanTech's feedstock.

CleanTech says the nanofiltration stage of the endeavour used the latest DuPont FilmTec LiNE-XD Element high productivity nanofiltration membranes for lithium brine purification to achieve superior purification and efficiency.

NEXT STEPS

CleanTech is currently undertaking a PFS process validation trial in Chile, advanced definitive feasibility study- (DFS-) level adsorbent testwork in France and a spent brine reinjection option study.

The company is undertaking a pilot programme with Xian Lanshen New Material Company to optimise and verify the process used in the PFS for the Laguna Verde project.  A volume of 20 m3 of feed brine from Laguna Verde is being processed at Lanshen´s pilot plant facility in Santiago, Chile.

Reports have been received on the first stage to verify DLE process parameters, and the second stage of evaluating advanced membrane and purification process steps. The final stage is carbonation to lithium carbonate to meet rigorous Chinese battery grade standards, including production of a 5 kg sample of lithium carbonate.

When the final stage is completed and the lithium carbonate sample has been tested by an external laboratory, the results will be reported to the market.

The absorbent testwork, meanwhile, will involve a trial starting in the coming weeks together with French consulting firm Hephaistos Insights, which will conduct DLE benchmarking and eluate analysis using brine from Laguna Verde.

The programme will assess a range of adsorbent options against the project's specific brine chemistry, with a particular focus on elution efficiency. The bench-scale testing, which will be executed by specialist subcontractor Seprosys, will include CleanTech's current reference adsorbent alongside alternatives from North American and European suppliers.

This workstream is designed to confirm the optimal adsorbent selection for Laguna Verde ahead of the DFS.

In this regard, Zelandez will deploy a multidisciplinary team of hydrogeologists, reservoir engineers and DLE experts to evaluate aquifer reinjection concepts, which will culminate in a technical analysis that integrates vital basin-dynamics, environmental permitting screens and cost modelling to deliver a recommended DFS workplan than can advance sustainable development of Laguna Verde.

 

 

 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Latest Multimedia

Photo of Martin Creamer
On-The-Air (24/07/2026)
Updated 1 hour 54 minutes ago By: Martin Creamer

Showroom

M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 
Willard Batteries
Willard Batteries

Willard Batteries is one of the leading brands in automotive battery power products. With a rich history spanning over 70 years, Willard batteries...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 24 July 2026
Magazine round up | 24 July 2026
24th July 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.048 0.071s - 134pq - 2rq
Subscribe Now