https://www.miningweekly.com

Caledonia starts operating solar plant at Blanket mine

14th November 2022

By: Marleny Arnoldi

Online News Editor

     

Font size: - +

Dual-listed Caledonia Mining Corporation’s solar plant at the Blanket gold mine, in Zimbabwe, started operating on November 14 and will soon supply about 27% of the mine’s average daily electricity demand.

The mine, however, still receives the majority of its electricity from Zimbabwe’s State-owned power utility Zesa.

Caledonia took it upon itself to install a 12.2 MW solar plant at the mine to make up for severe power constraints and inconsistent supply in the country, which has had economic and safety implications for the underground mine.

Prior to installation, during outages or low voltages, the company had to supplement with diesel generators to enable uninterrupted mining and capital operations, which comes with its own set of implications on the environment and cost-wise.

“With 21% of Blanket’s on-mine costs relating to energy use, this solar plant is an important project for Caledonia, as it will improve the quality and security of the mine’s electricity supply and provide environmental benefits through cleaner energy.

“The solar power will displace more expensive power from the grid and from the diesel generators, and is expected to reduce Caledonia’s consolidated cost per ounce of gold produced by about $37,” CEO Mark Learmonth explains.

 

Edited by Chanel de Bruyn
Creamer Media Online Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Projects

Showroom

Flanders Electrical SA
Flanders Electrical SA

FLANDERS Southern Africa provides integrated solutions for mining and industrial operations, covering field services, automation, electrification,...

VISIT SHOWROOM 
Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Northam Platinum CEO Paul Dunne.
Eland mine heading for complete greenness, Northam Platinum highlights
28th August 2026 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.062 0.105s - 111pq - 2rq
Subscribe Now