Receive our free daily newsletter:
Ausenco Engineering Canada
Ausenco Engineering Canada News
TSX-V-listed TDG Gold Corporation has initiated a preliminary economic assessment (PEA) for its 100%-owned Shasta gold/silver project in the Greater Shasta-Newberry area of the Toodoggone district...
Canada-based gold development company Artemis Gold Inc has maintained its full-year 2026 production guidance of 265 000 oz to 290 000 oz of gold.
Surge Copper has made strong progress on the project prefeasibility study.
Work is progressing on the project, which aims to become the only facility of its kind in North America as demand for battery materials rises.
Opemiska is being advanced as a 12 500 t/d openpit operation over a 17-year life-of-mine.
A prefeasibility study published in December 2025 has presented a plan for developing the combined Lawyers-Ranch project using openpit and underground mining methods, with ore processed at a single...
Paramount Gold Nevada has received federal approval after the signing of the record of decision for the development.
Surge Copper has completed its 2025 multidisciplinary drilling and field programme at the Berg copper project, marking an important step towards a prefeasibility study.
The project has been formally named as the second development to be advanced under Ontario's new One Project, One Process framework.
Surge Copper Corp has completed its 2025 multidisciplinary drilling and field programme, in a key step towards a prefeasibility study planned for the first half of this year.
Oregon regulators have released a draft consolidated permit package for the project.
Surge Copper has moved its Berg project into full prefeasibility study design and cost work.
TSX-V-listed Surge Copper has moved its Berg copper/molybdenum project in British Columbia into full prefeasibility study (PFS) design and cost work, following the completion of trade-off studies...
Electra Battery Materials Corporation has issued a major mechanical, piping, electrical and instrumentation tender package as part of its refinery construction works.
1 |
Research Reports
Projects
Latest Multimedia
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation


























