Tsingshan may triple output at its Zimbabwe steel plant
Tsingshan Holding Group is considering as much as tripling output at a Zimbabwe steel plant it started in 2024, an expansion that could add to pressure on South Africa’s struggling steel industry as much of its production is exported to that country.
Output of the Manhizhe steel plant, 205 km southeast of the capital Harare may be raised to as much two-million tons from 600 000 t currently, said Benson Xu, chief executive officer of Tsingshan’s Zimbabwean unit.
“First of all we want to diversify the steel products,” he said in an interview last week at the plant. “Then we will also put up the volume” in the near future, he added, saying rail infrastructure would need to be improved.
Of the mill’s current output, 40% is sold locally with the rest exported, most of that to South Africa. Steel is also sold to Malawi and Zambia, he said.
The potential expansion of the plant, which primarily produces steel used in construction, comes as South African steelmakers struggle to compete with imports as they contend with a sluggish economy, erratic rail service and surging power costs.
ArcelorMittal South Africa, South Africa’s biggest steel producer, last year shut a mill producing construction steel, citing competition from imports as well as local competitors using subsidised scrap as their raw material rather than iron-ore.
Tsingshan would also need to build a plant to process metallurgical coal for use in the mill’s furnace. The company also mines iron ore for the plant in Zimbabwe.
“It’s quite massive,” he said of the planned expansion, declining to say how much it would cost.
The company is also in talks with the country’s sovereign wealth fund, Mutapa Investment Fund, to form a rail joint venture.
Zimbabwe’s State-owned steel mill, Ziscosteel, ceased production in 2008.
Tsingshan is also the world’s largest nickel producer and maker of stainless steel. The company is controlled by its founder, Xiang Guangda.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















