https://www.miningweekly.com
First Phosphate|Canada|Bégin-Lamarche|Port Of Saguenay|Critical Minerals|Mining|Phosphate|Natural Resources Canada|Claude Guay|Tim Hodgson|Québec|Saguenay–Lac-Saint-Jean
|||||||
first-phosphate|canada|bgin-lamarche|port-of-saguenay|critical-minerals|mining|phosphate|natural-resources-canada|claude-guay|tim-hodgson|qubec|saguenaylac-saint-jean

More Canadian federal investment in Québec aimed at realising Bégin-Lamarche phosphate mine

Phosphate pellets in hand

Phosphate pellets in hand

6th August 2026

By: Marleny Arnoldi

Online News Editor

     

Font size: - +

Parliamentary Secretary to Canada's Minister of Energy and Natural Resources, Claude Guay, has announced $5-million of investment under the country's First and Last Mile Fund in the Saguenay–Lac-Saint-Jean region that will help advance infrastructure essential to responsibly develop critical minerals in Québec.

The support is specifically targeted at First Phosphate's Bégin-Lamarche phosphate mine, with First Phosphate having committed to catalyse an additional $5-million in private investment.

This latest bit of funding builds on a $16.7-million investment through Natural Resources Canada's Global Partnerships Initiative for First Phosphate's Bégin-Lamarche demonstration and feasibility project to produce high-quality phosphorous in Saguenay–Lac-Saint-Jean, which was announced in March.

Quebec accounts for nearly one-fifth of Canada's mineral production, containing significant deposits of critical and strategic minerals including phosphate, which is used in lithium iron phosphate batteries, renewable energy storage systems, off-grid power solutions and emergency backup systems used by Canadians every day.

This funding will go towards pre-development work including feasibility and environmental studies, as well as engagement with Indigenous and local communities to help determine the best routes and designs for power transmission and transportation infrastructure that would link the mine to regional rail networks and the Port of Saguenay.

This will speed up responsible development by addressing infrastructure gaps that can delay resource development.

The projects that underpin development of the Bégin-Lamarche mine are expected to create about 500 jobs during construction, while the mine is expected to create 300 jobs once production starts in 2029.

"By investing in enabling infrastructure, the government of Canada is building more resilient, sovereign supply chains; reducing reliance on non-allied materials; supporting Indigenous and community participation; and creating good-paying jobs. Canada has what the world wants, and we are working with Québec and Indigenous Peoples to unlock our resources to create jobs, prosperity and security for all," says Energy and Natural Resources Minister Tim Hodgson.

Guay adds that Canada and Québec have an opportunity to become a reliable supplier of the critical minerals the world needs for the technologies and industries of the future. "We're supporting critical minerals projects in Saguenay–Lac-Saint-Jean and beyond to strengthen Canadian supply chains, create economic opportunities and build Canada Strong."

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Rosond
Rosond

ROSOND provides fast, efficient, safe, and cost-effective drilling and grouting services to mining and exploration industries throughout Africa.

VISIT SHOWROOM 
Iritron
Iritron

Iritron delivers advanced automation, control, and optimisation solutions to the Mining, Minerals & Metals, Consumer Package Goods and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Centre for Science, Technology and Innovation Indicators research specialist Dr Amy Kahn.
Is South African mining’s modernisation urgency falling largely on deaf ears?
Updated 1 hour 4 minutes ago By: Martin Creamer
This week: Anglo highlights ability to provide capital efficient copper growth in tightening market; Valterra Platinum remains ‘highly confident’ in ‘robust outlook’ for PGM demand and, Decarbonisation reinforcing demand for Kumba Iron Ore‘s high grade, lump products
Resources Watch
5th August 2026
Glencore CEO Gary Nagle.
Glencore half-year earnings up 86% to $10bn
5th August 2026 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.047 0.07s - 136pq - 2rq
Subscribe Now