Glencore's copper output up 15%, sees strong $3.3bn marketing earnings
Global miner Glencore said on Wednesday first-half copper production rose 15% on higher grades at key operations, while its marketing unit is expected to generate about $3.3-billion in adjusted core earnings, putting it on track to far exceed the top end of its annual guidance.
The Swiss-based commodities trader and miner produced 397 000 tons of copper in the first six months of the year, up from 343 900 tons in the same 2025 period, driven by improved grades at its African operations and at its Antamina mine in Peru.
It maintained its full-year production guidance at 810 000 and 870 000 tons.
The marketing business is headed for another bumper year, with first-half adjusted earnings before interest and taxes of about $3.3-billion already near the top end of its annual guidance range of $2.3-billion to $3.5-billion.
Cobalt production fell 46% year-on-year to 10 200 tons in the first half as export quotas in the Democratic Republic of Congo continued to constrain shipments. Glencore said it prioritised copper production, deferring some cobalt output for processing and sale once export restrictions ease.
The DRC suspended cobalt exports in 2025 to support prices after the battery metal fell to nine-year lows, later replacing the ban with an export quota system in October.
Glencore reports first-half results on August 5 as a six-month standstill restricting renewed merger talks with Rio Tinto nears its expiry. The company has long signalled its appetite for transformational deals, but its pursuit of the mining giant has so far failed.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation


















