https://www.miningweekly.com

DRDGold’s first-quarter production down 3% q/q, but operating costs rise

4th May 2022

By: Donna Slater

Features Managing Editor and Chief Photographer

     

Font size: - +

Gold miner DRDGold’s production decreased by 3% quarter-on-quarter to 49 066 oz for the three months ended March 31, primarily owing to a 5% decrease in tonnage throughput.

Gold sold in the period decreased by 6% quarter-on-quarter to 48 572 oz and, as a result, elevated cash operating costs in rand terms by 3%, from R586 330/kg in the fourth quarter of 2021, to R605 011/kg for the first quarter of this year.

In dollar terms, cash operating costs were 5% higher quarter-on-quarter, at $1 237/kg.

Cash operating costs per tonne of material processed increased by 8% to R127/t, or by 9% in dollar terms to $8.30/t.

All-in sustaining costs decreased from R681 887/kg in the fourth quarter of 2021 to R677 996/kg for the first quarter of this year, mainly as a result of a decrease in sustaining capital expenditure.

All-inclusive costs for the period under review were R735 948/kg, up from the R709 706/kg of the fourth quarter of 2021, increasing quarter-on-quarter mainly as a result of increased non-sustaining capital expenditure.

As such, DRDGold’s adjusted earnings before interest, taxes, depreciation and amortisation decreased by 3% quarter-on-quarter to R367.3-million, primarily owing to a 6% decrease in gold sold, which was in-part offset by a 3% increase in the average rand gold price received to R914 864/kg.

Cash and cash equivalents increased by R70.4-million in the first quarter to R2.3-billion after DRDGold paid an interim cash dividend of R167.8-million for the six months ended December 31, 2021.

DRDGold reports that its management is “favourably” positioned to consider declaring a final cash dividend in or around August, in the absence of unforeseen circumstances.

Edited by Chanel de Bruyn
Creamer Media Online Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (05/06/2026)
5th June 2026 By: Martin Creamer
Photo of Martin Creamer
New cadastre, Sam Molefi, PyroFuZA make headlines
5th June 2026
Magazine round up | 05 June 2026
Magazine round up | 05 June 2026
5th June 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.051 0.075s - 110pq - 2rq
Subscribe Now