Black Rock signs offtake MoU with POSCO
PERTH (miningweekly.com) – Graphite developer Black Rock Mining has signed a non-binding memorandum of understanding (MoU) with strategic alliance partner POSCO over the supply of high-quality natural large flake graphite concentrate from the Mahenge project, in Tanzania.
The MoU covers the potential offtake of 6 000 t/y of graphite concentrate from the planned Mahenge Module 1, with the two companies now starting negotiations on a binding offtake agreement, which is subject to product specifications and commercial terms.
“Expanding the strategic partnership with POSCO is a meaningful step as Black Rock advances the Mahenge graphite project towards production. Not only are we building a stronger offtake position with one of the world’s largest battery anode producers, but critically, this agreement represents an important de-risking milestone for our potential lenders as part of finalising our project debt for Mahenge,” said Black Rock CEO John de Vries.
A recent independent review of the front-end engineering design and an updated definitive feasibility study (eDFS) for the Mahenge graphite project has increased the project’s costs from the $116-million considered in the 2019 definitive feasibility study to $182-million.
The eDFS has increased the estimated Phase 1 production from 83 000 t/y of graphite to 89 000 t/y, with the mine life remaining unchanged at 26 years. Steady-state production has increased from an expected 340 000 t/y of graphite to 347 000 t/y, with the all-in sustaining cost now estimated at $518/t, up from the $494/t estimated in 2019, with throughput rates increasing from 1-million tonnes a year to 1.15-million tonnes a year.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation