https://www.miningweekly.com
Canmax|Lithium Plus Minerals|Australia|Darwin Port|Critical Minerals|Lithium|Mining|Testing|Northern Territory
|||Testing|
canmax|lithium-plus-minerals|australia|darwin-port|critical-minerals|lithium|mining|Testing|northern-territory

Australia's Lithium Plus outlines simple, quick returns lithium operation for Bynoe

Lithium ore

Photo by Bloomberg

20th October 2026

By: Marleny Arnoldi

Online News Editor

     

Font size: - +

ASX-listed Lithium Plus Minerals has outlined a rapid development pathway and high returns for the Bynoe lithium project, in Australia's Northern Territory.

The company finds in a scoping study the viability of a direct shipping ore operation using underground mining, on-site crushing and screening, and export through Darwin Port.

The study estimates an after-tax net present value of A$325-million for Bynoe, with an internal rate of return of 75.4% and payback period of 1.8 years from first production. For capital expenditure of A$87.7-million, the project can operate for six years to generate life-of-mine free cashflow of A$492-million.

Bynoe is poised to produce 48 400 t of contained lithium oxide production over its lifetime.

The company's simple, low-capital underground development strategy targets early cashflow, a small surface footprint and reduced environmental disturbance.

Lithium Plus advises that environmental approvals are well advanced, while a 20-year mining lease and offtake agreement with Chinese industrial group Canmax for 50% of production are in place.

The company is in the process of evaluating flexible funding options, including offtake-linked prepayments, strategic partner funding and debt and equity funding.

Lithium Plus envisions that a final investment decision will be reached during the second quarter of 2027 ahead of mine construction that can start shortly after.

The company continues to undertake drilling for resource growth and testing multiple nearby priority targets, particularly at the Lei primary deposit that remains open at depth.

 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
Essentra Components
Essentra Components

We are responsible manufacturers of essential components. Manufacturing 80 million parts a week, we have over 1 billion parts in stock.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

➕

➕

➕

➕

➕

RESEARCH CHANNEL AFRICA

SUBSCRIBE

➕

➕

➕

➕

➕

➕

➕

➕

➕

➕

CORPORATE PACKAGES

CLICK FOR A QUOTATION

➕

➕







sq:0.029 0.054s - 116pq - 2rq
Subscribe Now