https://www.miningweekly.com

Teck cuts refined zinc output forecast on wildfire impact

An image of Teck's Trial Operations

Teck's Trial Operations contains one of the world's biggest fully integrated zinc and lead smelting and refining complexes.

21st September 2021

By: Reuters

  

Font size: - +

Canadian miner Teck Resources cut its forecast for annual refined zinc production on Tuesday, citing an impact on its operations from wildfires in British Columbia.

The company projected refined zinc production for 2021 to be in the range of 285 000 t to 290 000 t, down from a previous estimate of 290 000 t to 300 000 t.

Teck's Trail Operations, located in British Columbia, were temporarily shut in August for about ten days due to poor ambient air quality resulting from wildfires. It contains one of the world's largest fully integrated zinc and lead smelting and refining complexes, as per the company's website.

The miner also reduced its third-quarter sales outlook for contained zinc from its Red Dog operations in northwest Alaska to 145 000 t to 155 000 t, down from 180 000 t to 200 000 t expected previously.

The latest production forecast cut comes months after Teck in July slashed its steelmaking coal output outlook by 1.9% at midpoint due to the wildfires.

Edited by Reuters

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

ASTPM
ASTPM

Established in 1983, the ASTPM is an industry association and representative body of the welded carbon steel tube and pipe manufacturers of South...

VISIT SHOWROOM 
CSIR International Convention Centre (CSIR ICC)
CSIR International Convention Centre (CSIR ICC)

CSIR International Convention Centre (CSIR ICC) - the leading conference and events venue in Pretoria/Tshwane.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.061 0.931s - 134pq - 2rq
Subscribe Now