https://www.miningweekly.com
Sodankylä|Anglo American|Finland|Sakatti|Cobalt|Copper|Critical Minerals|Mining|Nickel|Platinum|European Union|James Wyatt-Tilby|Finnish Lapland
|||||||
sodankyl|anglo-american|finland|sakatti|cobalt|copper|critical-minerals|mining|nickel|platinum|european-union|james-wyatt-tilby|finnish-lapland

Sakatti copper and polymetallic project, Finland – update

LOcation map of the Sakatti project

Photo by Anglo American

7th August 2026

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Sakatti copper and polymetallic project.

Location
Finnish Lapland, 15 km north of Sodankylä.

Project Owner/s
Multinational mining company Anglo American.

Project Description
Sakatti is a polymetallic greenfield project containing copper, nickel, platinum, palladium, gold, silver and cobalt. 

The mine design reflects the latest studies, and production profile which is expected to deliver 60 000 t/y to 80 000 t/y copper equivalent production from a state-of-the-art mine design with minimal surface footprint.

In March 2025, the project was awarded strategic project status under the European Union Critical Raw Materials Act, which enables it to benefit from the more efficient processing of permitting applications.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Capital expenditure is subject to ongoing studies, permitting and approvals.

Planned Start/End Date
The project is expected to start from the early 2030s.

Latest Developments
Prefeasibility studies (PFSs) are ongoing, with the mine design reflecting the latest studies and production profile, subject to permitting and approvals. 

Anglo further notes that the Finnish environmental-impact assessment has been approved, with the Natura 2000 assessment progressing. 

The PFS-B is targeted for December 2026.

Key Contracts, Suppliers and Consultants
Not stated.

Contact Details for Project Information
Anglo American (UK), James Wyatt-Tilby, tel +44 20 7968 8759 or email james.wyatt-tilby@angloamerican.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Projects

An image of gold bars
Horne 5 project, Canada
Updated 3 hours ago By: Sheila Barradas

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

MinRes Pilbara hub
MinRes posts strongest full-year financials yet
27th August 2026 By: Marleny Arnoldi
Resources Watch
Resources Watch
26th August 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.045 0.078s - 119pq - 2rq
Subscribe Now