Name of the Project
Pilgangoora Operation – P1000 project expansion.

Location
Australia.

Project Owner/s
Australian lithium miner Pilbara Minerals.

Project Description
P1000 has a targeted production capacity of up to one-million tonnes a year.

It includes the upgrade of the Pilgan plant’s concentrator and supporting infrastructure, which will significantly increase the Pilgangoora Operation’s total production capacity. The expansion is expected to improve economies of scale and lower future operating costs.

Potential Job Creation
During peak construction, 560 jobs were created on site. About 50 permanent operational roles have also been created.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
A$560-million.  

Planned Start/End Date
Pilbara Minerals announced the completion of the project in January 2025.

Latest Developments
Pilbara Minerals announced the completion of its P1000 expansion project in January 2025. The project was completed ahead of schedule and within budget.

Commissioning is under way, with the ramp-up to full capacity expected in the September quarter of 2025.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Pilbara Minerals, tel +61 8 6266 6266.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Essentra Components
Essentra Components

We are responsible manufacturers of essential components. Manufacturing 80 million parts a week, we have over 1 billion parts in stock.

VISIT SHOWROOM 
Monitor Distributors
Monitor Distributors

We at Hawk High Pressure Pumps specialise in industrial pumps and pumping systems. Our high pressure washing equipment is locally manufactured and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

This week: Mintek targeting global flotation research recognition; First doré gold bar pour at DRDGOLD’s new Far West smelt house and, Expansion plans pointing to 75% increase in Sibanye-Stillwater’s chrome volumes
Resources Watch
22nd July 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.046 0.068s - 111pq - 2rq
Subscribe Now