Paringa finalises plans to develop Buck Creek No 2 mine ahead of No 1
JOHANNESBURG (miningweekly.com) – Coal developer Paringa Resources has successfully amended its coal sales contract with Louisville Gas & Electric and Kentucky Utilities (LG&E and KU), following its recent change in strategy to develop the Buck Creek No 2 mine ahead of the Buck Creek No 1 mine’s proposed 2.8-million-ton-a-year coal project.
Paringa decided in February to develop the No 2 mine first, as scoping studies revealed that it would transform the economics of the Buck Creek mine complex. Results from a scoping study demonstrated that the No 2 mine was a high-margin, 1.8-million-ton-a-year mine with a low capital expenditure of $44-million.
The company’s new staged development strategy would enable Paringa to come a strategic 5.6-million-ton-a-year supplier of high-quality coal for the Eastern US power market.
The amended cornerstone coal sales agreement with LG&E and KU, which agreed to the same terms as the original contract, now reflected delivery of coal from No 2 mine, though volumes and coal specifications remained unchanged. The project development milestones and delivery schedule for No 2 mine, however, were updated.
Fixed sale prices also changed slightly to reflect recent sales data, resulting in a fall of 7% in the nominal total value of the coal sales contract from $220-million to $205-million.
The amended contracted fixed coal prices for Paringa’s 11 200 btu coal specifications began at $40.50/t for the first 750 000 t of coal delivered to LG&E and KU, escalating to $45.75/t for the final million tons sold.
Sixty per cent of the No 2 mine’s yearly production during the five-year sales agreement would be contracted to LG&E and KU, significantly derisked the project for potential financiers.
“The fact that LG&E and KY are prepared to sign this major amendment to our sales contract confirms their belief that we will become a significant new source of production in the Illinois basin,” said Paringa president and CEO David Gay on Monday.
He added that the company was “progressing rapidly” with No 2 mine’s bankable feasibility study and had already identified a significant reduction in Paringa’s operating and capital costs.
Construction at No 2 mine was due to get under way in the second quarter of 2017, with production expected to begin mid-2018, before it reached full production in 2019.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation