https://www.miningweekly.com

New Dawn shuts Dalny mine

2nd September 2013

By: Leandi Kolver

Creamer Media Deputy Editor

  

Font size: - +

JOHANNESBURG (miningweekly.com) – TSX-listed New Dawn Mining on Friday announced that its 84.7%-owned Zimbabwean operating subsidiary Falcon Gold Zimbabwe has shut down its 100%-owned Dalny mine, owing to a liquidity problem caused by the drop in the gold price and operational problems at the mine.

As a result of the liquidity problem, amounts owed to the Zimbabwe Electricity Supply Authority (Zesa) in respect of the mine’s operations were not being paid on an acceptable basis, leading to Zesa having issued a Notice of Disconnection of electrical services to the mine.

“Without electrical power, the company cannot operate the mine and was forced to shut down the Dalny operations. As part of the shutdown, the 900-employee workforce is being placed on unpaid leave and the company is moving the mine into care and maintenance,” New Dawn stated.

New Dawn said an underlying factor that contributed to the mine’s difficulties was the more than two-year delay in the still incomplete approval process of the company’s indigenisation plan.

“A timely approval of the plan was expected to provide the company with access to sufficient investment capital to fully fund the development of a cost-efficient operation at the Dalny mine.

“After years of underdevelopment, had an investment programme been implemented and completed as originally expected, the mine would have been positioned to maintain profitable operations in today’s environment of lower gold prices and increasing costs, the company said.

It added that there was heightened uncertainty surrounding the implementation of indigenisation policy in Zimbabwe, following the national elections, with the potential for an increasingly negative effect on the company and its stakeholders.

“The evolving policy on indigenisation now appears to be focusing on seizing 51% controlling interests in foreign-controlled mines, with compensation deemed to be the value of the minerals in the ground. The company is continuing its efforts to gain approval for and implement a compliant plan of indigenisation,” New Dawn stated.

The company was currently unable to predict the effect of an inability to conclude or implement an acceptable plan of indigenisation; however, it stated that such failure could result in the termination of New Dawn’s mining licences in Zimbabwe, the loss of ownership or control of its assets and operations in the country without monetary compensation, other sanctions against New Dawn’s Zimbabwe operations or subsidiaries, or another unforeseen result.

A combination of further adverse factors, such as steadily increasing payroll and power costs, high domestic royalties, taxes and fees, as well as a damaging and costly illegal strike and the lack of full electrical power earlier this year, also contributed to the decision to terminate the mining operations at Dalny.

New Dawn added that it intended to engage with the mine’s creditors to craft a plan to deal with the mine’s outstanding trade payables, which totalled about $3.1-million.

The mine was expected to remain on care and maintenance until New Dawn was able to satisfactorily address the financial and operational issues that contributed to its shutdown or until a potential sale, joint venture or some other arrangement was realised.

The Dalny mine produced 1 949 oz of gold in the quarter ended March, and 2 762 oz of gold in the June quarter.

Edited by Chanel de Bruyn
Creamer Media Online Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.05 0.902s - 128pq - 2rq
Subscribe Now