https://www.miningweekly.com
Lotus Resources|Malawi|Kayelekera|Uranium|Greg Bittar
||||
lotus-resources|malawi|kayelekera|uranium|greg-bittar

Lotus resumes production at Kayelekera

17th April 2026

By: Sabrina Jardim

Senior Online Writer

     

Font size: - +

ASX-listed Lotus Resources has resumed uranium production at its Kayelekera mine, in Malawi, after processing operations had to be suspended on April 4, following fire damage to two electrical control panels in the drying and packaging area.

Lotus notes that interim engineered panels have been successfully installed, allowing processing operations to resume.

“While this interruption was not ideal, the team has combined its expertise and critical spares on site to quickly alleviate downtime and enable Lotus to resume processing in less than two weeks. New panels are expected to be delivered to site and installed in the coming weeks,” says Lotus MD Greg Bittar.

Lotus says it remains on track to achieve steady-state production at Kayelekera for the second quarter of this calendar year.

Edited by Chanel de Bruyn
Creamer Media Online Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

ATI Systems
ATI Systems

ATI systems comprises five divisions: electrical assemblies, drives and controls, feedback sensors, enclosures, and strip guiding.

VISIT SHOWROOM 
Lilak Aluminium
Lilak Aluminium

For over 15 years, Lilak Aluminium, a trusted leader in architectural extrusion supply, has delivered excellence to businesses like yours.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (24/07/2026)
24th July 2026 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.057 0.084s - 133pq - 2rq
Subscribe Now