Karo Platinum project, Zimbabwe – update

Image of platinum nugget

16th December 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Karo Platinum project.

Location
The Great Dyke, in the Mashonaland West district of Zimbabwe.

Project Owner/s
Karo Platinum, which is jointly owned by the government of Zimbabwe and Karo Mining Holdings.

Tharisa is a 70% shareholder in Karo Mining, which, in turn, indirectly owns 85% of the Karo Platinum project, with the government of Zimbabwe holding the remaining 15% of the project on a free-carry basis.

Project Description
Karo Platinum is a proposed Tier 1 openpit, scalable, low-cost and -risk project, which will be developed in phases.

The project has initial probable reserves of 35.5-million tonnes at 2.31 g/t and 2.5-million ounces of platinum, palladium, rhodium and gold.

The operation will have a throughput of 205 000 t a month, producing 194 000 oz/y over a 17-year life-of-mine.

The integrated mining and refining complex includes the establishment of a 300 MW solar photovoltaic (PV) power plant, which will feed power into the Zimbabwe electricity grid.

Potential Job Creation
The project will create about 1 000 direct jobs during construction and another 7 000 indirect jobs.

Net Present Value/Internal Rate of Return
The project has a net present value, at a 10% discount rate (excluding in situ inferred resources) of $413-million and an internal rate of return of 26.1%.

Capital Expenditure
Total capital expenditure for Phase 1 is estimated at $391-million.

Planned Start /End Date
The project has a 24-month design and construction schedule, which started on July 1, 2022. The mine is expected to break ground in December 2022, with first ore in the mill planned for July 2024.

Latest Developments
Total Eren and Aim-listed Chariot have agreed to work together on the development, financing, construction and operation of a solar PV project, which will provide competitive electricity for the Karo platinum project.

The solar PV project is expected to have an initial installed capacity of 30 MW, with a potential extension of up to 300 MW.

Construction of the Karo platinum mine has also started, marked by an official ceremony on December 7, 2022.

Karo is also raising funds through a proposed bond listing on the Victoria Falls Stock Exchange. The funds will be used, in part, to fund the development of the Karo platinum project.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Karo Mining Holdings, email info@karomining.com.

Edited by Creamer Media Reporter

Comments

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
14th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.375 0.446s - 91pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: