Guardian Metals outlines viable tungsten trioxide operation in Nevada
New York- and London-listed Guardian Metal Resources finds in a prefeasibility study (PFS) that the Pilot Mountain tungsten project, in Nevada, can viably produce 15 916 t/y of tungsten trioxide over an eight-year mine life.
The study results indicate that using a conventional openpit mining method and base case tungsten pricing of $197 300/t of tungsten trioxide, Pilot Mountain can generate after-tax free cash flow of $1-billion, with a capital payback period of one year from first commercial production.
The project has a net present value of $660-million and an internal rate of return of 59.6% at base case tungsten prices, however, these values increase to $1.3-billion and 101%, respectively, at the current tungsten spot price of $304 000/t.
At spot prices, Pilot Mountain can generate after-tax free cash flow of $2-billion.
The PFS includes an updated mineral resource estimate covering two project zones - Garnet and Desert Scheelite - as well as a mineral reserve statement for the project.
Guardian Metal CEO Oliver Friesen says the PFS would not have been possible without support from the US Department of War, which invested $6.2-million in the company's subsidiary, Golden Metal Resources.
"We are delivering this PFS at an inflection point: we believe the global tungsten market is undergoing an unprecedented structural reset and the world is waking up to the immense importance of securing reliable, home-grown critical mineral supply.
"The PFS establishes the project as one of the more compelling tungsten development opportunities in the Western world. It demonstrates robust economics using conservative pricing assumptions, with considerable upside at current tungsten prices, and the project's exploration potential," Friesen states.
Production from the Pilot Mountain project is targeted for the fourth quarter of 2028.
Meanwhile, the project's current mineral resources increased to 21 600 t of tungsten trioxide in the indicated category, with probable reserves totalling 20 275 t of tungsten trioxide.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















