https://www.miningweekly.com
Forrestania Resources|Ramelius Resources|Australia|Edna May|Lake Johnston|Copper|Gold Mining|Lithium|David Geraghty|Western Australia
|||||
forrestania-resources|ramelius-resources|australia|edna-may|lake-johnston|copper|gold-mining|lithium|david-geraghty|western-australia

Forrestania to expand processing footrint with A$300m buyout of nearby Edna May gold hub

Edna May mine

Edna May mine

29th June 2026

By: Marleny Arnoldi

Online News Editor

     

Font size: - +

Australian gold, copper and lithium explorer Forrestania Resources has agreed to acquire 100% of the Edna May gold mine and associated infrastructure, in the Western Australian Wheatbelt, from Ramelius Resources for a total consideration of A$300-million.

The deal, which includes the 2.9-million-tonne-a-year Edna May Mill, will comprise a A$200-million cash consideration and A$100-million in Forrestania shares.

The acquisition complements Forrestania's existing Lake Johnston processing hub, which is currently undergoing refurbishment, and advances the company's consolidation strategy that is focused on securing high-quality, advanced and permitted gold assets.

Forrestania plans to restart the Edna May Mill during the first half of next year, with Forrestania to supply the plant with ore from its existing proximate mineral resources, prior to assessing any longer-term restart of mining operations at Edna May.

Forrestania is planning a capital raise to complete the acquisition.

The company already holds a significant tenure and resources around Edna May, with the acquisition building out on the company's dual processing hub-and-spoke network, increasing Forrestania's operational flexibility and ensuring the right ores go to the right mill.

"This transaction upholds Forrestania’s strategy to consolidate the proven and prospective gold assets in the Forrestania region. About 12 months ago, Forrestania embarked on an aggressive merger and acquisition strategy to consolidate stranded high-quality gold assets and underexplored tenure surrounding Edna May.

"This strategy has been incredibly successful and set Forrestania up for Edna May’s acquisition. We believe [the project] has the proven development and delivery team that is ready to refurbish, upgrade and commission the 2.9-million tonnes Edna May Mill going forward," says Forrestania chairperson David Geraghty

This work will be completed in conjunction with Forrestania’s commissioning of Lake Johnston which is on track for late 2026.

"Forrestania is at an exciting juncture as it now has the growing resource base and the processing infrastructure to deliver on its gold production strategy," Geraghty concludes.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Projects

Hualilan project site
Hualilan gold project, Argentina
Updated 2 hours 56 minutes ago By: Sheila Barradas

Showroom

North Ridge Pumps
North Ridge Pumps

North Ridge Pumps is an independent manufacturer of pumps. We have a proven track record for product support and customer service throughout the...

VISIT SHOWROOM 
CSIR International Convention Centre (CSIR ICC)
CSIR International Convention Centre (CSIR ICC)

CSIR International Convention Centre (CSIR ICC) - the leading conference and events venue in Pretoria/Tshwane.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

This week: Mintek targeting global flotation research recognition; First doré gold bar pour at DRDGOLD’s new Far West smelt house and, Expansion plans pointing to 75% increase in Sibanye-Stillwater’s chrome volumes
Resources Watch
22nd July 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.043 0.075s - 117pq - 2rq
Subscribe Now