https://www.miningweekly.com
Connacher Oil And Gas|Greenfire Resources|Waterous Energy Fund|Canadian Dollar|Great Divide|Oil Sands
|||
connacher-oil-and-gas|greenfire-resources|waterous-energy-fund|canadian-dollar|great-divide|oil-sands

Canada's Greenfire Resources to buy Connacher for $900m

Greenfire Resources plant in Canada

Greenfire Resources plant in Canada

14th July 2026

By: Reuters

  

Font size: - +

Greenfire Resources said on Monday that it has agreed to acquire privately held Connacher Oil and Gas Limited for around C$1.27-billion ($900-million) in cash.

On a combined basis, Greenfire's 2026 production is expected to rise to about 34 000 barrels a day, with combined reserves of 850-million barrels, with a long-term plan to increase production to about 65 000 barrels a day.

Connacher is a thermal oil sands company with a 100% operated interest in the Great Divide oil sands project and is expected to produce about 19 500 barrels a day of oil in 2026, with proved plus probable reserves of roughly 441-million barrels.

The deal will be financed through a mix of debt and equity, including an about C$700-million draw on an upsized C$1.0-billion reserves-based loan and a C$575-million bridge facility.

The bridge facility is expected to be repaid with proceeds from a planned rights offering, for which Waterous Energy Fund has committed a standby backstop of at least C$575-million.

Greenfire said it expects to capture about C$30-million a year in synergies from combined midstream, marketing, operating cost and general and administrative savings by the end of 2026.

The transaction is expected to close in August 2026.

Edited by Reuters

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
ATI Systems
ATI Systems

ATI systems comprises five divisions: electrical assemblies, drives and controls, feedback sensors, enclosures, and strip guiding.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (10/07/2026)
10th July 2026 By: Martin Creamer
Northern Cape copper, South African PGMs make headlines
Northern Cape copper, South African PGMs make headlines
10th July 2026 By: Creamer Media Reporter

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.069 0.102s - 132pq - 2rq
Subscribe Now