https://www.miningweekly.com

Banfora gold project, Burkina Faso

31st July 2015

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Banfora gold project, Burkina Faso.

Client
Gryphon Minerals.

Project Description
An optimisation study on the Banfora project has highlighted significant enhanced project economics using additional control data for in-pit resources.

The study considers the development of a two-million-tonne-a-year heap-leach start-up operation, as well as the upside potential for expansion by adding a conventional one-million-tonne-a-year carbon-in-leach (CIL) processing plant.

The 2014 feasibility study only considered a two-million-tonne-year heap-leach operation.

With the addition of the CIL plant, Banfora’s mine life is expected to decrease from 9.2 years, estimated in the original scoping study to seven years.

Gold production is expected to increase from 70 600 oz/y in the 2014 feasibility to 133 000 oz/y.

Net Present Value/Internal Rate of Return
The optimised study has increased the project’s after-tax net present value, at a 5% discount rate, from A$90-million in 2014 to A$210-million.

The project’s internal rate of return has increased from 20.5% to 42.2%.

Value
Capital costs, including working capital and contingencies, are estimated at A$130-million, from $97-million in the 2014 feasibility study.

$85-million has been earmarked for the heap-leach operation and $45-million for the CIL.

The CIL costs could be funded with early cash flow from the initial heap-leach operations.

The 2014 study estimated costs at about A$97-million.

Duration
Not stated.

Latest Developments
With the optimisation and additional capacity studies completed and a mining permit granted, Gryphon can progress to the completion of debt funding due diligence, which is one of the final hurdles to starting development at the project.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Gryphon Minerals, tel +61 8 9287 4333, fax +61 8 9287 4334 or email admin@gryphonminerals.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Craig Miller Technical Services (CMTS)
Craig Miller Technical Services (CMTS)

CMTS is a leading, well-established EC&I contractor with 37+ years of mining and industrial experience. We execute full-scope EC&I projects with...

VISIT SHOWROOM 
VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

This week: Mintek targeting global flotation research recognition; First doré gold bar pour at DRDGOLD’s new Far West smelt house and, Expansion plans pointing to 75% increase in Sibanye-Stillwater’s chrome volumes
Resources Watch
22nd July 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.037 0.058s - 111pq - 2rq
Subscribe Now