Banfora gold project, Burkina Faso
Name and Location
Banfora gold project, Burkina Faso.
Client
Gryphon Minerals.
Project Description
An optimisation study on the Banfora project has highlighted significant enhanced project economics using additional control data for in-pit resources.
The study considers the development of a two-million-tonne-a-year heap-leach start-up operation, as well as the upside potential for expansion by adding a conventional one-million-tonne-a-year carbon-in-leach (CIL) processing plant.
The 2014 feasibility study only considered a two-million-tonne-year heap-leach operation.
With the addition of the CIL plant, Banfora’s mine life is expected to decrease from 9.2 years, estimated in the original scoping study to seven years.
Gold production is expected to increase from 70 600 oz/y in the 2014 feasibility to 133 000 oz/y.
Net Present Value/Internal Rate of Return
The optimised study has increased the project’s after-tax net present value, at a 5% discount rate, from A$90-million in 2014 to A$210-million.
The project’s internal rate of return has increased from 20.5% to 42.2%.
Value
Capital costs, including working capital and contingencies, are estimated at A$130-million, from $97-million in the 2014 feasibility study.
$85-million has been earmarked for the heap-leach operation and $45-million for the CIL.
The CIL costs could be funded with early cash flow from the initial heap-leach operations.
The 2014 study estimated costs at about A$97-million.
Duration
Not stated.
Latest Developments
With the optimisation and additional capacity studies completed and a mining permit granted, Gryphon can progress to the completion of debt funding due diligence, which is one of the final hurdles to starting development at the project.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Gryphon Minerals, tel +61 8 9287 4333, fax +61 8 9287 4334 or email admin@gryphonminerals.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation