https://www.miningweekly.com

Industry

Location

Value

Projects

Image of iron-ore stockpile
Jambreiro iron-ore project, Brazil – update
12th April 2024 By: Sheila Barradas

Centaurus has reported encouraging results from recent bench-scale metallurgical testwork at the project. 


Core sample from the Khemisset project
Khemisset potash project, Morocco – update
12th April 2024 By: Sheila Barradas

Emmerson has entered into a subscription agreement with Global Sustainable Minerals, which will result in the company’s gaining a 20.3% shareholding in Emmerson.  


Image of mineral sands
North Perth Basin mineral sands project, Australia – update
12th April 2024 By: Sheila Barradas

The project is advancing to final Ministerial approval. 


IMAGE OF IRON-ORE BUCKET
Simandou iron-ore project, Guinea – update
12th April 2024 By: Sheila Barradas

The Guinea government has said shareholders involved in Simandou have signed $15-billion in financing agreements for the project. 


Rock at Premier mine showing gold mineralisation
Premier gold project, US – update
12th April 2024 By: Sheila Barradas

Ascot Resources has marked a key milestone at the new mine. 


Aerial view of the Phase 3 concentrator
Kamoa-Kakula Copper Complex, Democratic Republic of Congo – update
12th April 2024 By: Sheila Barradas

Ore from the Kamoa 1 mine is being stockpiled on surface. 


Image of gold bars
Goldrush underground gold project, US
12th April 2024 By: Sheila Barradas

Nevada Gold Mines plans to develop an estimated 400 000 oz operation by 2028. 


Aerial view of the NAL operation
North American Lithium carbonate plant, Canada – update
12th April 2024 By: Sheila Barradas

The detailed review of the project has concluded that it must continue ramping up to steady-state production. 


Image of gold pour
Côté gold project, Canada – update
5th April 2024 By: Sheila Barradas

Iamgold has successfully completed the inaugural gold pour at the Coté project. 


Drill core from the Congo-Brazzaville
Dougou Extension sylvinite project, Congo-Brazzaville – update
5th April 2024 By: Sheila Barradas

Kore remains focused on completing the financing of Kola. 


Elandfontein project
Elandsfontein phosphate project, South Africa – update
5th April 2024 By: Sheila Barradas

Kropz is ramping up to steady-state production. 


Image of Kayelekera project
Kayelekera uranium restart project, Malawi – update
5th April 2024 By: Sheila Barradas

Lotus Resources has appointed a debt adviser to arrange debt for the project. 


Location map of the Kouroussa project
Kouroussa gold project, Guinea – update
5th April 2024 By: Sheila Barradas

Commercial production will be delayed beyond the targeted first quarter of 2024. 


Image of washed reverse circulation cuttings
Monte Muambe rare earths project, Mozambique – update
5th April 2024 By: Sheila Barradas

Altona has reported several achievements during the six months ended December 31, 2023. 


Location map of the Moblan project
Moblan lithium project, Canada
5th April 2024 By: Sheila Barradas

A definitive feasibility study has demonstrated a financially and technically viable operation. 


Image of Sweden map/flag
Häggån polymetallic project, Sweden
5th April 2024 By: Sheila Barradas

A scoping study has determined that the project is a significant polymetallic deposit that provides a key growth opportunity for Aura Energy. 


Location map of the Longonjo project
Longonjo neodymium/praseodymium project, Angola – update
5th April 2024 By: Sheila Barradas

Pensana has reported that preparatory works are advancing smoothly. 


Image of gold pour
Salares Norte gold project, Chile – update
5th April 2024 By: Sheila Barradas

Production has started. 


Image of potash ore
Kola potash project, Congo-Brazzaville – update
5th April 2024 By: Sheila Barradas

Kore Potash plans to use the proceeds of a convertible loan to advance work on the project. 


Image of the Langer Heinrich operation
Langer Heinrich uranium restart project, Namibia – update
5th April 2024 By: Sheila Barradas

Uranium concentrate production and drumming have been completed. 


Image of first production of rare earths sulphates
Phalaborwa Rare Earths Project, South Africa – update
5th April 2024 By: Sheila Barradas

Rainbow Rare Earths is bullish about the potential of the project, as it is expected to be the highest-margin rare earth elements project in development. 


Image of periodic table symbol for uranium
Amarillo Grande uranium/vanadium project, Argentina
5th April 2024 By: Sheila Barradas

A preliminary economic assessment on the Ivana uranium/vanadium deposit at the project has demonstrated robust economics for a surficial mining operation. 


Image of Cascabel project drill core
Cascabel copper/gold/silver project, Ecuador
29th March 2024 By: Sheila Barradas

A new prefeasibility study has determined that over an initial 28-year mine life, Cascabel could produce 4.3-million tonnes of copper equivalent. 


Image of lithium ore
Bougouni lithium project, Mali – update
29th March 2024 By: Sheila Barradas

The project is on track to start production in the fourth quarter. 


Image of stockpile of lithium ore
Cinovec lithium project, Czechia and Germany – update
29th March 2024 By: Sheila Barradas

European Metals has delayed the publication of a definitive feasibility study for the project. 


Large native copper nugget
Costa Fuego copper project, Chile – update
29th March 2024 By: Sheila Barradas

Hot Chili has signed a memorandum of understanding (MoU) with Puerto Las Losas to evaluate bulk tonnage loading alternatives for copper concentrates from the project. 


Image of periodic table symbol for lithium
Goulamina lithium project, Mali – update
29th March 2024 By: Sheila Barradas

Leo Lithium has reported that progress at Goulamina remains on schedule and construction has reached about 80% completion. 


Aerial view of the Kachi project
Kachi lithium brine project, Argentina – update
29th March 2024 By: Sheila Barradas

Lake Resources has submitted the production environmental-impact assessment for the project. 


Head gear at the Okiep mine
Okiep copper project, South Africa – update
29th March 2024 By: Sheila Barradas

Progress has been made with the completion and submission of the Flat mines project bankable feasibility study for independent expert review. 


Image of Priesk headgear
Prieska copper/zinc project, South Africa – update
29th March 2024 By: Sheila Barradas

An updated mineral resource estimate for the +105 m level crown pillar block – has revealed an increase in tonnes and grade. 


1 2
3
4 5 6 7 8 9

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







pqt: 2.941s - ct: 3.045s - 326pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: