https://www.miningweekly.com
Energy|Financial|PROJECT|Resources|Drilling
Energy|Financial|PROJECT|Resources|Drilling
energy|financial|project|resources|drilling

Häggån polymetallic project, Sweden

Image of Sweden map/flag

5th April 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Häggån polymetallic project.

Location
The Häggån project is based on a substantial discovery in the Jämtland province, in central Sweden.

Project Owner/s
Aura Energy.

Project Description
Häggån has a defined a global mineral resource estimate of about two-billion tonnes at an average grade of 0.3% vanadium pentoxide containing 13.3-billion pounds vanadium pentoxide at a 0.2% vanadium pentoxide cutoff.

A scoping study has determined that the project is a significant polymetallic deposit that provides a key growth opportunity for Aura. The base case scenario proposes 3.5-million tonnes a year producing about 10 400 t/y vanadium pentoxide high-quality vanadium flake, 217 000 t/y sulphate of potash by-product for sale as fertiliser and 3 000 t/y mixed sulphide product.

The project also hosts very significant uranium mineral resources of 800-million pounds.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a projected after-tax net present value (NPV) between $380-million and $1.23-billion and an internal rate of return of 26% to 47%, with a payback of 1.5 years to 2 years. The NPV depends on the final plant configuration and forward price assumptions.

Capital Expenditure
The project has an initial capital cost of $592-million.

Planned Start/End Date
Not stated.

Latest Developments
Aura plans to undertake a prefeasibility study, including further resource and infill drilling. The company also aims to start discussions with preferred strategic partners that have financial resources to advance the project.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Aura Energy, tel +61 3 9101 8551 or email info@auraenergy.com.au
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 
SBS Tanks
SBS Tanks

SBS® Tanks is a leading provider of innovative water security solutions with offices in Southern Africa, East and West Africa, the USA and an...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024
Resources Watch
Resources Watch
2nd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.197 0.258s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: