Lamaque mine, Canada
Name of the Mine
Lamaque mine.
Location
Val-d’Or, in Quebec, Canada.
Mine Owner/s
Eldorado Gold.
Brief Description
The Lamaque site has all infrastructure in place to support mine and process operations. The site comprises the Triangle mine, which was built in two phases – Phase 1, which was completed in 2015, and Phase 2.
The Upper Triangle deposit is currently being mined through surface ramp access.
Lamaque also includes the historical Sigma openpit and underground mine and all associated infrastructures, as well as the historical Lamaque openpit underground mine.
Brief History
Eldorado achieved commercial production on March 2019, from ore mined at the Upper Triangle deposit and processed at the refurbished Sigma mill.
Primary Metals/Minerals
Gold.
Secondary Metals/Minerals
None stated.
Geology/Mineralisation
The Lamaque operation comprises the Triangle gold deposit an Archean greenstone-hosted orogenic lode gold deposit.
Gold is found within quartz/tourmaline carbonate veins, which are hosted within a series of subparallel subvertical shear zones centred around a steeply plunging cylinder-shaped porphyritic diorite – the Triangle Plug – which intrudes the mafic volcanic stratigraphy of the Val d’Or formation.
Individual gold-bearing veins and associated alteration are on average 4 m to 5 m thick, subvertical and extend 500 m to 700 m horizontally and vertically and have a fully diluted average grade of about 7 g/t gold.
As yet, seven structures have been identified by drilling from surface to about 1 000 m vertical depth. Secondary structures or splays from these principal shear zones can also host significant gold but are normally less widespread and more sporadic.
A deep drilling programme has shown that the mineralised system extends to at least 2 km below surface.
Reserves
Total proven and probable reserves as at September 30, 2021, were estimated at 4.7-million tonnes grading 7.3 g/t gold.
Resources
Total measured and indicated resources as at September 30, 2021, were estimated at 7.1-million tonnes grading 8.5 g/t gold. Inferred resources were estimated at 8.9-million tonnes grading at 6.9 g/t gold.
Mining Method
Underground, using mechanised longhole stoping.
Major Infrastructure/Equipment
The Lamaque site has all infrastructure in place to support mine and process operations.
The site comprises the Triangle mine and Sigma mill.
The Triangle mine includes a mine dry and office, a garage, a warehouse, mine ventilation facilities, a compressor house, waste rock stockpile, a slurry plant, a cement silo, a core logging building, a surface fuel station.
The Sigma mill comprises a main plant, covered crushed ore storage, a crushing facility and a warehouse.
Support infrastructure includes a regional administration office, an exploration office and core yard, construction offices near Sigma mill, site water management and collection ponds, and a tailings storage facility.
Prospects
Eldorado continues to extensively explore the Lamaque property, which includes drilling on the Triangle, Parallel, Plug No 4, and Ormaque deposits.
Contact Details
Eldorado Gold
tel +1 604 601 6650
website http://www.elodradogold.com.
Sources
Eldorado Gold. Technical Lamaque project, Quebec (December 31, 2021).
Eldorado Gold. Investor presentation (August 2022).
Eldorado Gold. Website: https://www.eldoradogold.com/ [accessed August 8, 2022].
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation