https://www.miningweekly.com

Eldorado Q1 output in line with 2021 guidance

13th April 2021

By: Creamer Media Reporter

     

Font size: - +

Canada-based Eldorado Gold on Monday announced first-quarter preliminary gold production of 111 742 oz, which the miner said was in line with its 2021 yearly guidance of 430 000 oz to 460 000 oz.

The Kisladag mine, in Turkey, contributed the bulk of production with output of 46 172 oz, while Lamaque, in Canada, produced 28 835 oz and Efemcukuru, in Turkey, delivered 23 298 oz.

Olympias, in Greece, added 13 437 oz to the preliminary quarterly total.

Eldorado will publish its first quarter financial and operational results on April 29.

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION