Yauricocha mine expansion, Peru

Image of the Chumpe Mill at the Yauricocha mine

18th March 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Yauricocha mine expansion.

Location
Yauyos province, in Peru.

Project Owner/s
Sierra Metals.

Project Description
The Yauricocha mine is an underground mining operation with a long production history using well-established, proven mining methods. The majority of the mining is conducted using mechanised sublevel caving, with a relatively small portion of the mine using overhand cut-and-fill.

An updated preliminary economic assessment (PEA) on the proposed expansion of the mine has concluded that Yauricocha will have a capacity of 1.98-million tonnes a year over an 11-year mine life with a maximum production rate of 5 500 t/d.

Life-of-mine (LoM) copper production, payable in copper concentrate, is estimated at 320.3-million pounds and in payable lead in concentrate at 12.6-million pounds.

Mineralised material will be processed at the Chumpe plant using conventional two-stage crushing, followed by grinding classification and a differential flotation circuit to produce commercial-quality lead/silver and copper.

LoM payable production is estimated at 19 900 oz gold, 10.9-million ounces zinc, 131.2-million pounds lead and 399.9-million pounds zinc.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an estimated net present value, at an 8% discount rate, of $273.1-million.

Capital Expenditure
The total initial development capital for the Yauricocha mine expansion is estimated at $102.2-million, which includes a contingency of $10.8-million.

Planned Start/End Date
Mine development is expected to be undertaken between 2022 and 2023, ramping up to 5 500 t/d in 2024 until 2029, when production will taper off until the end of the LoM.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
SRK Consulting (Canada) and Redco Global Peru (PEA).

Contact Details for Project Information
Sierra Metals, tel + 1 866 493 9646 or email info@sierrametals.com.

Edited by Creamer Media Reporter

Comments

Showroom

John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 
Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 May 2024
Magazine round up | 17 May 2024
17th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.182 0.242s - 91pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: