Name of the Project
Yanfolila gold project.

Location
The Yanfolila gold project comprises two main clusters of ore deposits: Komana East (KE), Komana West (KW), Guirin West (GW) and Gonka (GK), in the south; and Sanioumale East (SE) and Sanioumale West (SW), in the north of Mali.

Client
Hummingbird Resources.

Project Description
Hummingbird has completed an optimised mine schedule, which has improved the Joint Ore Reserves Committee-compliant ore reserve statement and updated economic sensitivities based on the new reserve and mine schedule for the Yanfolila gold project.

The project’s reserves have increased from 6.82-million tonnes at a grade of 3.03 g/t of gold in the January 2016 definitive feasibility study (DFS) to 7.04-million tonnes at a grade of 3.14 g/t of gold in the optimised mine schedule.

The DFS financial model has been updated to incorporate the increased ore reserve and new mine schedule, with a resulting improvement in project economics. The project will be developed as an openpit, low-cost gold mining operation.

The DFS life-of-mine (LoM) plan envisages the progressive mining of five openpits, starting initially with KE and KW, and then progressing to GW, SE and SW.

Hummingbird is also considering developing the high-grade Gonka resource, initially as an openpit and then as an underground mine.

The plant will have a throughput of 1.24-million tonnes a year, producing up to 107 000 oz/y of gold.

The ore is nonrefractory and the simple process plant design uses gravity and carbon-in-leach (CIL) for the processing and recovery of the gold, which averages 92.5% over the LoM.

Jobs to be Created
Not stated.

Net Present Value/Internal Rate of Return
The project’s net present value (NPV) has increased from $88-million, at an 8% discount rate in the 2016 DFS, to an NPV, at an 8% discount rate, of $162-million.

The project’s internal rate of return has increased from 37% in the DFS to 60% in the optimised mine schedule.

Value
The project’s estimated capital expenditure has remained the same from the DFS to the optimised mine schedule.

Duration
Not stated.

Latest Developments
Hummingbird has appointed Imagri to oversee the civil works at its Yanfolila gold project.

The contractor will oversee the completion of the run-of-mine tip and primary and secondary crushers and screen, and the milling and CIL area.

The civil works also comprise all aspects of constructing steel reinforced concrete structures including, besides others, equipment bases, plinths, strip and raft foundations, surface beds and bunded areas.

Ancillary works, such as water supply, sewage systems and building works, will also form part of Imagri’s scope of works.

Hummingbird has said that mobilisation to site will continue throughout September, with work to start in October.

The appointment of the civil contractor and mobilisation of equipment is a pivotal undertaking in the project's evolution into a producing mine.

“Imagri’s local experience, which includes working for Randgold in Mali, will be invaluable as we advance Yanfolila,” CEO Dan Betts said.

Key Contracts and Suppliers
DRA Projects (DFS); CSA Global (mineral resource and ore reserves reports); Senet (metallurgical testwork, process design and engineering, and capital and operating cost estimates for the processing plant and the associated plant infrastructure); Schlumberger Water Services (hydrology and hydrogeological studies); and Ausenco Engineering Canada (design and cost estimates for the tailings storage facility).

On Budget and on Time?
Hummingbird has reported that development at Yanfolila continues on schedule and budget, as it targets initial production of 130 000 oz gold from the first full year of production.

Contact Details for Project Information
Hummingbird Resources, tel +44 20 3416 3560.
DRA Projects, tel +27 11 202 8600 or email info@DRAglobal.com.
CSA Global, tel +27 11 568 2724, fax +27 11 676 6689 or email csasouthafrica@csaglobal.com.
Senet, tel +27 11 409 1300 or fax +27 11 409 1301.
Schlumberger Water Services, tel +27 11 6841122 or fax +2786 576 6034.
Ausenco Engineering Canada, tel +27 11 258 8591.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

ASTPM
ASTPM

Established in 1983, the ASTPM is an industry association and representative body of the welded carbon steel tube and pipe manufacturers of South...

VISIT SHOWROOM 
Virtual Gas Network (Pty) Ltd
Virtual Gas Network (Pty) Ltd

Virtual Gas Network supplies compressed natural gas via a virtual gas distribution network.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.049 0.775s - 111pq - 2rq
Subscribe Now