https://www.miningweekly.com
Fire|Iron Ore|Mining|rail|Repairs|Operations
Fire|Iron Ore|Mining|rail|Repairs|Operations
fire|iron-ore|mining|rail|repairs|operations

Wildfires force IOC to cut production guidance

19th July 2023

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

North American iron-ore pellets and concentrates producer Iron Ore Company of Canada (IOC) has reduced its full-year production guidance by 500 000 t as it grapples with the aftermath of devastating wildfires in northern Quebec.

The miner, a subsidiary of diversified mining group Rio Tinto, reduced its production guidance to between 10-million and 11-million tonnes, from the previous forecast of 10.5-million to 11.5-million tonnes.

The updated guidance remains subject to further disruption from fire conditions, Rio Tinto said on Thursday.

IOC operations are integrated across a mine and processing plant in Labrador City, Newfoundland and Labrador, a port and stockpile in Sept-Iles, Quebec, and a 418-km railway that joins these two parts of the operation.

The company lost three-and-a-half weeks of production last month, owing to the wildfires in northern Quebec.

IOC’s iron-ore pellets and concentrate production fell by 21% year-on-year to 2.1-million tonnes and half-year output was 8% down at 4.6-million tonnes.

Shipments were higher in the second quarter, as IOC drew down inventory. However, loading restrictions at the rail and port remain a risk as the rail line had been damaged by fire and repairs remain under way.

Edited by Creamer Media Reporter

Comments

 

Showroom

AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 
Aqs image
AQS Liquid Transfer

AxFlow AQS Liquid Transfer (Pty) Ltd is an Importer and Distributor of Pumps in Southern Africa

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.273 0.336s - 109pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: