White Pine North copper project, US
Name of the Project
White Pine North copper project.
Location
The project is located in the historical copper range district of the upper peninsula of Michigan, in the US.
Project Owner/s
Highland Copper Company is acquiring the project from First Quantum subsidiary Copper Range Company, subject to several conditions including releasing Copper Range from certain environmental obligations pertaining to the historical mine.
Project Description
The White Pine North copper project is the extension of the historical White Pine mine that operated from 1953 to 1995.
The project has a life-of-mine (LoM) of 25 years, including one year of ramp-up, with an average LoM payable copper production of 89-million pounds a year and 1.3-million ounces of silver a year.
The project’s preliminary economic assessment envisions that the deposit will be mined using a conventional highly mechanised, drill-and-blast room-and-pillar mining method.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has an estimated pretax net present value, at an 8% discount rate, of $557.2-million and an internal rate of return of 19.2%, with a payback of 5.2 years from the start of processing.
Capital Expenditure
Initial capital expenditure is estimated at $456.8-million.
Planned Start/End Date
Upon receipt of the required permits and necessary approvals, a 48-month mine development, construction and commissioning period is foreseen, followed by 24 years of commercial production.
Latest Developments
Pending the final closing of Highland’s acquisition of White Pine North, Highland has started mineral exploration and baseline studies under an agreement with Copper Range.
Key Contracts and Suppliers
G Mining Services (PEA and mineral resource estimate).
On Budget and on Time?
Too early to state.
Contact Details for Project Information
Highland Copper Company, tel +145 0677 2455 or email info@highlandcopper.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















