https://www.miningweekly.com

Verde Potash reveals new phased development for Brazil project

21st August 2013

By: Creamer Media Reporter

  

Font size: - +

JOHANNESBURG (miningweekly.com) – Brazilian fertiliser development company Verde Potash now plans to undertake the development of its Cerrado Verde potash project, in Minas Gerais, Brazil, in a phased approach.

The company on Wednesday revealed details of its new strategic direction for the project, saying it has moved away from its previous plan to start directly on the implementation of a capital-intensive, large-scale production facility.

“Verde’s new plan is premised on the technical practicality of the project’s staged scale-up in order to reduce risk and to accelerate cash flow generation from its large potash resource in Brazil,” the company said in a statement.

The project would now be developed in two phases, with the first to comprise the construction of a 1 000 t/d Flex Plant for the production of ThermoPotash – a nonchloride, multinutrient fertiliser suitable for Brazilian soil.

Verde explained that ThermoPotash was a new product that could compete with other fertilisers, such as potassium sulphate and potassium nitrate, in the Brazilian market.

Further, the Flex Plant would also be used to run the pyro stage of a larger potassium chloride (KCI) production phase. The successful operation of the pyro stage of the KCl production process would enable the company to obtain the desired performance guarantees for Phase 2 of the new strategy, which would see the development of a 12 000 t/d kiln for KCI production.

The two-phased strategy was aimed at reducing the upfront capital expenditure on the project by initially establishing the less capital-intensive ThermoPotash product. Sales of ThermoPotash would also generate cash for the company while the second phase was implemented.

Verde Potash – which expects to complete prefeasibility studies (PFS’s) for both phases in the first quarter of 2014 – and its engineering partners have started on the design work for Phase 1.

Verde Potash indicated that it remained confident that it had sufficient cash on hand to complete its PFS and definitive feasibility studies for the project. The company has also been in discussions with Brazilian institutions regarding possible debt financing for Phase 1.

Edited by Chanel de Bruyn
Creamer Media Online Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

The Southern African Institute of Mining and Metallurgy
The Southern African Institute of Mining and Metallurgy

The SAIMM started as a learned society in 1894 after the invention of the cyanide process that saved the South African gold mining industry of the...

VISIT SHOWROOM 
Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.045 0.83s - 110pq - 2rq
Subscribe Now