Name of the Project
Vele colliery expansion project.
Location
Limpopo, South Africa.
Client
Coal of Africa Limited (CoAL).
Project Description
As at September 28, 2012, Vele had Joint Ore Reserves Committee-compliant resources of:
• 795.7-million gross tonnes in situ and 672.9-million mineable tonnes in situ of shallow-dip coal,
• 362.5-million tonnes, including 42.4-million tonnes of proven reserves and 325.6-million tonnes of probable reserves, and
• 42.4-million tonnes of run-of-mine (RoM) from the central and northern pits over a 16-year period, producing 16.5-million tonnes of saleable product.
The mine is currently configured as an opencast mine, but underground mining is a possibility in the future, owing to the significant resource.
A modular coal treatment plant was established during the first phase of the project.
CoAL is modifying and expanding its Vele colliery beneficiation plant, which will enable CoAL to optimally produce semisoft coking coal, thermal coal and sized coal simultaneously at an expected processing capacity of 2.7-million tonnes a year of RoM. The planned three-month front-end engineering and design (FEED) process will enable CoAL to arrive at a Class 1 engineering, procurement and construction estimate.
The scope of work for the FEED contract includes:
• identifying and improving sections of the existing plant to ensure a 500 t/h throughput capacity,
• a stockpile management philosophy and associated design,
• an RoM handling, crushing and screening section,
• a destoning wash plant,
• a sized-coal screening plant,
• a classifier in the fines beneficiation circuit,
• a froth flotation plant for the beneficiation of the ultrafines, and
• products and discard stockpiling and load-out facilities.
Jobs To Be Created
Not stated.
Net Present Value/Internal Rate of return
Not stated.
Value
The total capital expenditure to complete plant modification is estimated at R450-million and includes the necessary mine development and production ramp-up.
Duration
The expansion project will be completed by the end of 2015, with production ramp-up in early 2016.
Latest Developments
The Vele colliery remains on care and maintenance.
CoAL is awaiting the granting of an integrated water use licence by the Department of Water and Sanitation, which is the final approval required to complete the regulatory approval process for the stream diversion regarding the plant modification project.
Once all regulatory approvals are in place, the company will be able to consider current market pricing and offtake agreements make a favourable investment decision on the project.
Key Contracts and Suppliers
Sedgman South Africa (FEED).
On Budget and on Time?
Not started.
Contact Details for Project Information
CoAL head of engineering, Nico Pretorius, email nico.pretorius@coalofafrica.com, or investor relations and business development manager Celeste Harris, email celeste.harris@coalofafrica.com
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation