A preliminary economic assessment on the project has marked the Velardeña project as an attractive scenario for a restart.
The Velardeña mine plan includes 1.14-million tonnes of sulphide material, with a mine life of about ten years at 310 t/d.
The project contains total measured and indicated resources of 1.35-million tonnes grading 317 g/t silver, 4.92 g/t gold, 1.54% lead and 1.78% zinc. Inferred resources are estimated at 1.77-million tonnes grading 354 g/t silver, 4.73 g/t gold, 1.72% lead and 1.86% zinc.
Production is estimated at 12.33-million oz of silver with a grade of 337 g/t, 188 250 oz of gold with a grade of 5.15 g/t gold, 33.10-million pounds of lead with a grade of 1.32% lead and 40.89-million pounds of zinc with a grade of 1.63% zinc. The project will include the bio-oxidation treatment of gold concentrates.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has an estimated pretax net present value, at an 8% discount rate, of $85.9-million and an internal rate of return of 138.6%, with a payback of one year.
Capital Expenditure
Total preproduction capital costs are estimated at $10.27-million, including a 10% contingency.
Planned Start/End Date
Preproduction development is estimated at one year.
Latest Developments
In the coming months, Golden Minerals plans to continue optimising the mine plan and processing details. This is in preparation for future test-mining and processing in advance of establishing a definite schedule for restarting commercial production at the Velardeña mines and the installation of the bio-oxidation circuit.
Key Contracts and Suppliers
None stated.
Contact Details for Project Information
Golden Minerals, tel +130 3839 5060 or email information@goldenminerals.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation