Varvara hub, Kazakhstan

15th June 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name: Varvara hub.

Location: Kostanay region, in north-west Kazakhstan.

Controlling Company: Polymetal International.

Brief Description: The Varvara hub, which has a mine life to 2032, comprises the Varvarinskoye (Varvara), Komarovskoye (Komar), Maminskoye and Dollinoye deposits.

The hub consists of an openpit gold mine.

Brief History: Varvara was discovered in 1981 in the historic hard-rock gold mining Urals Fold Belt. European Minerals Corporation (later Orsu Metals) acquired the rights to the deposit and subsequently built an openpit mine, a processing plant and other supporting infrastructure.

Openpit mining started in 2006 and the gold circuit of the processing plant started in December 2007, with the copper/gold circuit starting in March 2008.

Polymetal International acquired the mine in 2009 as a standalone gold and copper mine.

Products: Gold/copper.

Geology/Mineralisation: The mineralised bodies at Varvarinskoye are classic gold/copper skarn types that are primarily contained within the eastern side of the local fault and are associated with the border between geological formations. Copper/gold porphyry is overlain with quartz-sulphide gold veins and scarn to produce very complex and geometrically complicated zones of economic mineralisation. Mineralisation is discontinuous over a strike length of 4 km and is divided into five zones.

The main primary copper mineral is chalcopyrite with some bornite. The gold is mostly in free form and associated with pyrites and other sulphides. A hallow oxidation zone occurs within 10 m to 50 m below the surface. In this part of the Varvara deposit, copper is mostly represented by oxide minerals not amenable to conventional flotation.

Komar is a low-sulphide, quartz-gold deposit located along the contact of the granite intrusion. Mineralisation occurs within the fault zone and consists of steeply dipping quartz-carbonate-micaceous metasomatites hosted by schists. The overall strike length of Komar is about 6 800 m, with individual mineralised zones generally 500 m to 600 m in length and 4 m to 6 m in width. Oxidation depth is limited to 30 m to 50 m below surface.

Reserves: Total proven and probable reserves as at January 1, 2018, were estimated at 58.6-million tonnes with a gold equivalent of 1.7 g/t of gold.

Resources: Total measured and indicated resources as at January 1, 2018, were estimated at 27.32-million tonnes, with a gold equivalent of 1.5 g/t of gold. Inferred resources were estimated at 15.92-million tonnes with a gold equivalent of 2.2 g/t of gold.

Mining Method: Ore at Varvara and Komar is mined using conventional openpit truck-and-shovel and drill-and-blast methods.

Major Infrastructure and Equipment: Varvara’s processing facilities are located at one site. Run-of-mine ore is crushed in batches in a jaw crusher, with separate crushed-ore storage for leach and float material. Gold doré and gold/copper concentrate are produced from the two circuits of the single processing plant.

The float ore circuit comprises two-stage milling (semiautogenous mill and ball mill) and conventional flotation. Concentrate is thickened, filtered, packed in big bags and trucked to a railway spur for transport to the offtaker.

The leach ore circuit comprises two-stage milling, conventional carbon-in-pulp leaching, carbon desorption and regeneration, electrolysis and smelting. The ultimate product is gold doré.

Ore containing more than 0.2% copper (float material) is transported to a 1.1-million-tonne-a-year flotation circuit, with the final product being a gold/copper concentrate that is sold to an offtaker.

Ore containing less than 0.2% copper (leach material) is treated by carbon-in-leach (CIL), with the final product of this process being gold doré, which is sold to an offtaker. The CIL facility has a capacity of 3.15-million tonnes a year.

Prospects: Mining activity continues to shift towards Komar as several openpits at Varvara have been completely mined out.

Further extensions at the Varvara hub are expected as a result of pit enlargement and additional exploration activities, particularly at Komar.

Contact Details:
Polymetal International
Tel +7 812 334 3666
Fax +7 812 753 6376
Email ir@polymetalinternational.com
Website https://www.polymetalinternational.com

 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Sika South Africa
Sika South Africa

Sika South Africa is a trusted partner for the nation’s infrastructure, commercial, residential, and industrial sectors.

VISIT SHOWROOM 
ECG Engineering
ECG Engineering

ECG provides specialised electrical engineering services to the Mining, Utilities, Materials Handling and Industrial industries, with extensive and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.047 0.972s - 111pq - 2rq
Subscribe Now