Vale's iron-ore output falls as operations failure hits key mine
SAO PAULO - Brazilian miner Vale reported on Tuesday a 3.9% year-on-year decline in its third-quarter iron-ore output, hit by a production snag at a key mine.
The firm produced 86.2-million metric tons of iron-ore during the July-to-September period, according to a securities filing.
The miner's quarterly production was hit by a one-time failure of a conveyor belt system in August at its S11D mine complex in northern Brazil, the filing added.
The failure caused lost production of around two million tons. Despite this, production was up 9.5% from the second quarter.
Vale also mentioned a lower run-of-mine production from its Paraopeba mining complex.
Iron ore sales, meanwhile, grew 6.6% to reach 69.1-million tons, as the firm said it benefited from favorable market conditions.
The fresh figures marked the third consecutive quarter Vale reported shipments well below its output, raising concerns for further inventory build after signaling it would draw down its stocks.
"The build-up in iron ore inventory is increasingly concerning to us considering the potential for a weak Q4 period and this might call into question FY24 volumes," analysts at RBC wrote in a note to clients.
Even so, Vale's iron-ore operations hit its targets, "but there is little else that is not a material miss in these results," RBC analysts said. Consensus estimates for the firm's earnings, scheduled for next week, should come down sharply, they added.
The average price of Vale's iron ore was $105.1 per ton in the quarter, up 13.5% from a year ago.
Copper production grew 9.8% to total 81 600 t, mostly due to the ramp-up of Vale's Salobo III mine.
Despite growing copper output during the quarter, Vale cut its forecast for production of the red metal in 2023 to a range of 315 000 t to 325 000 t. The company blamed the downward revision on changes at its Coleman mine in Canada as well as additional maintenance at the Salobo mine.
Nickel production fell 18.7% to 42 100 tons, "in line with plan," Vale said, while sales of the metal came in at 39200 t, or 11.5% below a year ago.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation