https://www.miningweekly.com
Construction|Dewatering|Flow|Gold|Installation|Mining|Pipes|PROJECT|Road|Water|Flow|Environmental
Construction|Dewatering|Flow|Gold|Installation|Mining|Pipes|PROJECT|Road|Water|Flow|Environmental
construction|dewatering|flow-company|gold|installation|mining|pipes|project|road|water|flow-industry-term|environmental

Valentine receives Fisheries Act authorisation, bridge replacement gets started

25th October 2022

By: Creamer Media Reporter

     

Font size: - +

Toronto-based gold company Marathon has received authorisation from Fisheries and Oceans Canada for the Valentine project, in central Newfoundland.

The authorisation allows Marathon to proceed with all site activities regulated by the Fisheries Act, such as dewatering of small freshwater ponds for openpit mine development, changes in flow owing to site water management, and placement of water intake and effluent pipes.

The authorisation follows the successful completion of the federal environmental assessment process in August.

“The latest authorisation under the Fisheries Act is a major permit under federal jurisdiction for the project, and governs the important aspects of water management and the protection of fish and fish habitat. Its receipt is timely, and supports the scheduled site work currently under way,” said president and CEO Matt Manson.

“The early works mobilisation at Valentine has gone well, and we are able to report good progress in each work area including temporary camp installation, grubbing and tree removal, pad construction, haul road development, and pre-strip mining for construction materials.”

The Fisheries Act authorisation also includes approval to proceed with a proposed fish habitat offsetting project, which will involve the restoration of salmonid habitat in Victoria river impacted by previous logging activities in the area. Submerged pulpwood in the river will be removed to expose the original substrate, returning the spawning and nursery habitat to its pre-logging condition.

BRIDGE REPLACEMENT
Meanwhile, Marathon has started the replacement of the Victoria river bridge. This is an important river crossing on the principal access road along the southern shore of Beothuk Lake (formerly Red Indian Lake) connecting the project to the community of Millertown and the broader Central Newfoundland region. 

The existing bridge is in poor condition, and has been under load restriction for some time. Its replacement has been a priority of Marathon’s but could not be undertaken while the project remained under environmental assessment. The new bridge will allow heavier loads to be transported to the project site, and will provide a more reliable and, most importantly, safer crossing for local residents, cabin owners and recreational users.

As the replacement work is ongoing, the access route along the southern shore of Beothuk Lake will be closed for five to six weeks.

Marathon is also currently undertaking road upgrades between the project site and the “Roebuck’s” road intersection at the southwest end of Beothuk Lake.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

Showroom

SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 
Showroom image
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.127 0.162s - 109pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: