Vale to slow down iron-ore production in Q4 due to low prices
Brazilian miner Vale said on Tuesday it was slowing down production of low-margin iron-ore in the fourth quarter by about four-million tonnes due to low prices, and could cut back output in 2022 if prices did not rise.
Vale said in a securities filing that iron ore output for the year is now expected to fall within the lower half of its target range, currently set at between 315-and 335-million tonnes.
The miner added that it would reduce its offerings of low-margin products in 2022 by 12-million to 15-million tonnes if the current scenario did not change.
"Production and sales strategy is based on market conditions, prioritising value over volume, with focus on margin maximisation," Vale said.
In the third quarter, Vale said it had produced 89.42-million tonnes of iron ore, about 0.8% more than in the same period a year earlier.
It also said it had produced 30 200 t of nickel, 22% less than a year earlier, mostly due to labour disruptions at its Sudbury mine.
Iron ore prices have fallen sharply from record prices reached in May following an end to supply constraints and a weaker demand outlook in China.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation