https://www.miningweekly.com
Copper|Engineering|Gold|PROJECT|Resources|System|Testing
Copper|Engineering|Gold|PROJECT|Resources|System|Testing
copper|engineering|gold|project|resources|system|testing

Updated San Matias resource estimate shows higher grades

4th July 2019

By: Tasneem Bulbulia

Senior Contributing Editor Online

     

Font size: - +

Cordoba Minerals has announced a positive updated mineral resource estimate for the San Matias project, including the Alacran replacement copper/gold deposit, in Colombia, with significant tonnage and copper and gold grade increases at the Alacran deposit.

Nordmin Engineering’s work on the San Matias mineral resource estimate included a detailed geological re-examination of the structural controls to high-grade gold veins within the Alacran deposit.

The updated mineral resource estimate also includes, for the first time, the three porphyry copper/gold/silver deposits at Montiel East, Montiel West and Costa Azul – the satellite deposits.

Metallurgical testwork improved the expected copper and gold recoveries within the saprolite, transitional and fresh sulphide zones of each deposit and demonstrated that silver is recoverable.

Additionally, the testwork indicates that up to 50% of the gold and silver may be recoverable by a gravity circuit, which, if verified through further metallurgical testing, will allow for production of doré bars on-site.

Total mineral resources for the San Matias project include 94.9-million tonnes of indicated resources grading 0.51% copper, 0.29 g/t gold and 2.7 g/t silver and 3.4-million tonnes of inferred resources grading 0.30% copper, 0.20 g/t gold and 1.30 g/t silver.

Total indicated resources contain 488 100 t of copper, 897 900 oz of gold and 8.25-million ounces of silver.

Total inferred resources contain 10 400 t of copper, 22 400 oz of gold and 142 800 oz of silver.

Drill core assays suggest that the Alacran system contains very low contents of deleterious elements such as arsenic and lead.

Nordmin is also completing a preliminary economic assessment for the San Matias project, which is expected later in the month.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 
VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

PGMs and green hydrogen make headlines
PGMs and green hydrogen make headlines
19th April 2024
Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.132 0.172s - 113pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: