The enhancements that have been brought to the new NEC4 contracts are widely positive and a direct result of feedback from the industry, says Cameron Staude, Alusani® Course Leader. “While the changes aren’t strictly necessary, the updates have added to an already successful contract. Some of the major improvements include the addition of a design build operate (DBO) contract as well as the Contractor’s design option as a secondary clause in the Engineering and Construction Contract (ECC),” says Staude.

According to the updated NEC4, the Contractor may propose a change to the Scope of work, which has the potential to reduce cost implications, and the contractor is now able to propose an acceleration to achieve Completion before the Completion Date. The Project Manager also has the option to accept and instruct, not accept, or request a quotation prior to making a decision.

The updated NEC4 may also lead to improved quality management as well as design and build contracting.
“The NEC4 contracts introduce a requirement for the Contractor to prepare and issue a quality management system and plan. A new secondary option has been created for the Engineering and Construction Contract (ECC) and Engineering and Construction Subcontract (ECS) with more extensive provisions specifically to support design and build contracting,” says Staude.

New methods of dispute resolution
The ECC now includes a dispute avoidance option. If the parties select this option, any dispute will be referred to a Dispute Avoidance Board nominated by the parties at the time the contract is formed. “This approach means that the Dispute Avoidance Board members become familiar with the project prior to any dispute arising by making regular visits to see the project at set intervals, or when requested by the parties. 

If a dispute arises, it is referred to the Dispute Avoidance Board for review. The board visits the project to discuss the issues with the parties and help find a solution,” says Staude.

The board will them provide a recommendation to resolve the dispute if it cannot be resolved through discussion.  The purpose is to encourage and support the parties in resolving any dispute or difference consensually, and to support users who wish to use this facility on their projects.  

Essentially, the contracts meet new market demands as well as the expectations of future users. While the contract isn’t radically different, it is evolutionarily different as it supports the changing requirements of users and stimulates good project management.

Alusani® has two options to help get you up-to-date on the NEC4 with Cameron Staude. You can either attend a 1-hour Webinar or a 1-day training course.

Send me more information about the Webinar – faith@alusani.co.za

Send me more information about the 1-day training course – imogen@alusani.co.za

©2017 Copyright Alusani Skills & Training Network®. All Rights Reserved. Unauthorised reproduction will be actionable under South African law.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

The Southern African Institute of Mining and Metallurgy
The Southern African Institute of Mining and Metallurgy

The SAIMM started as a learned society in 1894 after the invention of the cyanide process that saved the South African gold mining industry of the...

VISIT SHOWROOM 
Rosond
Rosond

ROSOND provides fast, efficient, safe, and cost-effective drilling and grouting services to mining and exploration industries throughout Africa.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.043 0.912s - 111pq - 2rq
Subscribe Now