Uatnan graphite project, Canada

Name of the Project
Uatnan graphite project.
Location
Quebec, Canada.
Project Owner/s
Nouveau Monde Graphite (NMG).
Project Description
The mining project covers Mason Graphite’s Lac Guéret graphite deposit. The project has total measured and indicated mineral resources of 65.64-million tonnes grading 17.2% graphitic carbon.
A preliminary economic assessment (PEA) has demonstrated attractive economics, with a targeted production estimated at 500 000 t/y of graphite concentrate over a 24-year life-of-mine, making it one of the world’s biggest graphite projects in development.
The mining method is a conventional openpit, truck-and-shovel, drill-and-blast operation.
Potential Job Creation
Initial modelling indicates that the project will create about 300 direct jobs.
Net Present Value/Internal Rate of Return
The PEA indicates a pretax net present value, at an 8% discount rate, of C$3.61-billion and an internal rate of return of 32.6%, with a payback of 2.8 years.
Capital Expenditure
Initial capital expenditure is estimated C$1.42-billion.
Planned Start/End Date
Not stated.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
NMG (PEA).
Contact Details for Project Information
NMG VP Communications and ESG strategy Julie Paquet, tel +1 450 757 8905 ext 140 or email jpaquet@nmg.com.
NMG director, investor relations Marc Jasmin, tel +1 450 757 8905 ext 993 or email mjasmin@nmg.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















